My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2005-829
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2005
>
Reso 2005-829
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:31 AM
Creation date
1/25/2006 1:57:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2005-829
Date (mm/dd/yyyy)
09/08/2005
Description
– Award Bid 05-06-01/Agmt Fence Masters, Median Fencing Improvements.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />" <br /> <br />u <br /> <br />11 <br /> <br />u <br /> <br />" <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />II <br /> <br />w <br /> <br />n <br /> <br />LJ <br /> <br />(l <br /> <br />L.J <br /> <br />n <br /> <br />LJ <br /> <br />II <br /> <br />LJ <br /> <br />n <br /> <br />L) <br /> <br />I' <br /> <br />LJ <br /> <br />" <br /> <br />u <br /> <br />" <br /> <br />'--J <br /> <br />"-'1 <br /> <br />LJ <br /> <br />n <br /> <br />L.J <br /> <br />i' <br /> <br />u <br /> <br />n <br /> <br />L.J <br /> <br />PART 3 - EXECUTION <br /> <br />3.01 <br /> <br />INSPECTIONS <br /> <br />A. <br /> <br />Examine areas to receive soil preparation to assure work of other trades has been <br />completed. <br /> <br />B. <br /> <br />Verify that plants to remain undisturbed have been clearly identified and protected from <br />injury during construction. If not, identify and protect plants to remain according to <br />procedures set forth in Section 02490 - Trees, Plants and Groundcover. Refer to <br />Protective Fencing on plans. <br /> <br />C. <br /> <br />Remove all construction materials and debris from all areas to be landscaped, without <br />additional expense to Owner, prior to subsoil preparation. <br /> <br />D. Do not proceed with soil preparation until all unsatisfactory conditions are corrected. <br /> <br />3.02 SITE PREPARATION <br /> <br />A. <br /> <br />General: Within the entire area to be landscaped as shown on the drawings, the <br />contractor shall complete the following site topsoil preparation items to eradicate all <br />existing weed and/or natural groundcover. Initiate site topsoil preparation as stated <br />herein and coordinate all work with the existing underground sprinkler system and <br />electrical lines. <br /> <br />B. <br /> <br />Post Emergence Herbicide: Apply "Roundup" as manufactured by Monsanto Corp. <br />according to manufacturer's recommended rate and specification within the limits of all <br />areas to be landscaped not specified as existing, to be relocated, or to be removed. <br />Protect existing plants from overspray. <br /> <br />C. <br /> <br />Pre-Emergence Herbicide: Apply "Ron-Star" or approved equal to all areas to be <br />landscaped according to the manufacturer's recommended rate and specification. <br />Contractor shall be responsible to re-apply appropriate herbicide to eradicate all <br />remaining weeds and maintain a weed-free condition in all areas throughout all <br />landscape planting operations. <br /> <br />3.03 PERFORMANCE <br /> <br />06/05 <br /> <br />A. <br /> <br />Subsoil: Remove all debris, gravel, rocks and other deleterious material over 2 inches in <br />diameter, within 12 inches of surface in areas to receive topsoil mixture, from the project <br />site. Fine grade subsoil to assure finish grades are achieved by adding the specified <br />depth of topsoil mixture. <br /> <br />B. <br /> <br />Soil mixtures: <br /> <br />1. <br /> <br />Remove rocks and other objects over 1 inch diameter. <br /> <br />2. <br /> <br />Smooth soil mixtures to four (4) inches below top of surrounding pavmg, <br />wherever planting beds abut paved surfaces. <br /> <br />3. <br /> <br />Do not compact planting soil mixture, but do wet-soak planting areas to assure <br />proper settlement. Replace topsoiVplanting soil mixture to specified grade after <br />watering, where necessary. <br /> <br />02484-5 <br /> <br />03-4138.8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.