Laserfiche WebLink
<br />11 <br /> <br />L.J <br /> <br />" <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />G <br /> <br />r, <br /> <br />u <br /> <br />n <br /> <br />v <br /> <br />r> <br /> <br />Li <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />(I <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />r\ <br /> <br />L.J <br /> <br />(\ <br /> <br />LJ <br /> <br />n <br /> <br />L.J <br /> <br />I' <br /> <br />L.J <br /> <br />n <br /> <br />L.J <br /> <br />n <br /> <br />L.J <br /> <br />4. <br /> <br />5. <br /> <br />6. <br /> <br />3.04 CLEAN-UP <br /> <br />06/05 <br /> <br />Smooth topsoil to two inches (2") below finish grade in areas to be sodded. <br />Remove plant material not indicated as existing or be relocated in order to <br />adhere to sod lines. <br /> <br />Prior to installing planting soil, test tree pits and planting areas for percolation. <br />If areas do not drain, it is the contractor's responsibility to assure percolation by <br />approved means. <br /> <br />Remove limerock or soil cement in tree planter islands within paved parking <br />areas. Do not damage sub-base material for paved surfaces. Assure percolation <br />and then backfill with approved planting soil mix. <br /> <br />A. <br /> <br />Immediately dean up spills, soil and conditioners on paved and finished surface areas. <br /> <br />B. <br /> <br />Remove debris and excess materials from project site immediately. <br /> <br />END OF SECTION <br /> <br />02484-6 <br /> <br />03-4138.8 <br />