My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2005-829
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2005
>
Reso 2005-829
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:31 AM
Creation date
1/25/2006 1:57:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2005-829
Date (mm/dd/yyyy)
09/08/2005
Description
– Award Bid 05-06-01/Agmt Fence Masters, Median Fencing Improvements.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />r, <br /> <br />LJ <br /> <br />,., <br /> <br />PART 3 - EXECUTION <br /> <br />LJ <br /> <br />n 3.0 I INSPECTION <br /> <br />LJ <br /> <br />A. <br /> <br />n <br /> <br />LJ <br /> <br />B. <br /> <br />n <br /> <br />Verify that soil to depth of 12 inches in compacted areas has been tilled to produce a <br />loose, friable soil conducive to exceptional sod growth. <br /> <br />Water dry soil to depth of 6 inches 48 hours before sodding. <br /> <br />3.02 INSTALLATION <br /> <br />u <br /> <br />A. <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />(I <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />[1 <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />(I <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />Transplant sod within 48 hours after harvesting. <br /> <br />B. <br /> <br />Begin sodding at bottom of slopes. <br /> <br />C. <br /> <br />Lay first row of sod in straight line with long dimension of pads parallel to slope <br />contours. <br /> <br />D. <br /> <br />Butt side and end joints. Ensure that joints are tight, thereby eliminating the need to <br />patch and/or topdress to eliminate gaps. <br /> <br />E. <br /> <br />Stagger end joints in adjacent rows. <br /> <br />F. Do not stretch or overlap rows. <br /> <br />G. <br /> <br />Peg sod on slope ratio of I in 3 or greater with minimum of two stakes per square yard. <br /> <br />H. <br /> <br />Sprinkle sod immediately after transplanting. <br /> <br />I. <br /> <br />Roll sod, except on pegged areas, with roller weighing no more than 150 lbs. per foot of <br />roller width. <br /> <br />1. <br /> <br />Water sod and soil to depth of 6 inches within four hours after rolling. <br /> <br />K. <br /> <br />Top dressing for sodded areas shall be clean sand, mined from fresh water sources. Sand <br />mined from salt water is unacceptable. <br /> <br />3.03 LAWN ESTABLISHMENT <br /> <br />LJ <br /> <br />(I <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />(I <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />06/05 <br /> <br />u <br /> <br />A. <br /> <br />Watering: <br /> <br />1. <br /> <br />Keep sod moist during first week after planting. <br /> <br />2. <br /> <br />After first week, supplement rainfall to produce a total of2 inches per day. <br /> <br />3. It is the contractors responsibility to water all plant material. <br /> <br />02487-4 <br /> <br />03-4138.8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.