Laserfiche WebLink
<br />II <br /> <br />LJ <br /> <br />" <br /> <br />L.J <br /> <br />n <br /> <br />L.J <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />II <br /> <br />LJ <br /> <br />II <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />.L-J <br /> <br />n <br /> <br />L.J <br /> <br />" <br /> <br />LJ <br /> <br />11 <br /> <br />LJ <br /> <br />11 <br /> <br />'LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />L.J <br /> <br />C. <br /> <br />Processed specifically for use as top mulch around plant beds. <br /> <br />2.05 GUYING AND STAKING MATERIAL <br /> <br />A. <br /> <br />Stakes for Tree Support: <br /> <br />1. <br /> <br />Construction grade lumber. <br /> <br />2. <br /> <br />Braces and Vertical Stakes: Nominal 2" x 2 ". <br /> <br />3. Stakes: Nominal 2" x 4" x 4'long and pointed at one end. <br /> <br />4. <br /> <br />Cross Braces: Nominal I " x 4" boards. <br /> <br />5. <br /> <br />All above grade stakes shall be painted with one coat of brown paint. Paint to be <br />approved by the Owner's Representative. <br /> <br />B. <br /> <br />Guying Wires: Annealed, galvanized iron or galvanized steel 12 gauge wire. Wire shall <br />be flagged with white or yellow surveyor tape minimum 2 per guy wire, (one flag near <br />ground level and one flag near the middle ofthe length of wire). <br /> <br />C. <br /> <br />Hose: <br /> <br />1. <br /> <br />Type: New /12 inch diameter 2-ply reinforced rubber or plastic hose. <br /> <br />2. <br /> <br />Minimum size: 3/4 in. <br /> <br />D. Turnbuckles: <br /> <br />1. <br /> <br />Turnbuckles are recommended but not required. Landscape Contractor shall be <br />responsible for keeping taut all guyed plant material and for keeping flagging in <br />place. One turnbuckle per guy wire is required if used. <br /> <br />2. Method of tightening guy wires to be approved by Landscape Architect. <br /> <br />3. <br /> <br />Guying to be tightened as needed, but always within two days of when found <br />necessary . <br /> <br />2.06 SLOPE STABILIZATION <br /> <br />06/05 <br /> <br />A. <br /> <br />Landscape contractor shall be responsible to stabilize grades by approved methods where <br />necessary at his own cost. <br /> <br />B. <br /> <br />Contractor shall stabilize all sloped areas 3 to I or greater and areas found to be required <br />to reduce surface erosion by the Owner's Representative with "Hold Gro" Erosion <br />Control Fabric as manufactured by Gulf States Paper Company, Tuscaloosa, Alabama or <br />approved equal. Contractor shall install erosion control fabric according to the <br />manufacturer's instructions. <br /> <br />02490-6 <br /> <br />03-4138.8 <br />