Laserfiche WebLink
<br />n <br /> <br />L.J <br /> <br />n <br /> <br />L.J <br /> <br />" <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />II <br /> <br />LJ <br /> <br />n <br /> <br />L.J <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />L.J <br /> <br />n <br /> <br />LJ <br /> <br />II <br /> <br />L.J <br /> <br />" <br /> <br />L.J <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />II <br /> <br />L.J <br /> <br />n <br /> <br />L.J <br /> <br />" <br /> <br />LJ <br /> <br />n <br /> <br />L.J <br /> <br />2.07 DRAINAGE GRAVEL <br /> <br />A. <br /> <br />Drainage gravel shall be River Run Gravel and shall be of graduated sizes. <br /> <br />B. <br /> <br />River Run Gravel shall be no smaller than one-half inch nor larger than two inches in any <br />direction. <br /> <br />c. <br /> <br />Gravel shall be installed as shown on drawings or to a minimum depth of 2 inches above <br />drains, and 4 inches throughout planters. <br /> <br />D. <br /> <br />Gravel shall be washed clean and contain no chemical elements harmful to plant growth. <br /> <br />E. <br /> <br />Coral rock shall not be used. <br /> <br />PART 3 - EXECUTION <br /> <br />3.01 INSPECTION <br /> <br />A. <br /> <br />Verify final grades have been established prior to beginning planting operation. <br /> <br />B. <br /> <br />Inspect trees, shrubs, and ground cover plants for injury, insect infestation, and trees and <br />shrubs for improper pruning. <br /> <br />C. Do not begin planting of trees until deficiencies are corrected, or plants replaced. <br /> <br />3 .02 LOCATION/STAKING <br /> <br />A. <br /> <br />Stake out locations for plants and outline of planting beds on ground. <br /> <br />B. <br /> <br />Do not begin excavation until stake out of plant locations and plant beds are acceptable <br />to the Landscape Architect. <br /> <br />c. <br /> <br />All trees are to be located and staked for inspection by the Landscape Architect. <br /> <br />3.03 PREPARATION <br /> <br />06/05 <br /> <br />A. Pits and Trenches: <br /> <br />1. <br /> <br />Shape: <br />a. <br />b. <br /> <br />Vertical sides and flat bottom. <br />Plant pits to be square or circular. <br /> <br />2. Size: <br />a. <br /> <br />For Trees: <br />(1) Depth: Minimum 2 ft. from finish grade and increased as <br />necessary to accommodate planting ball and at least 6 inch <br />planting soil backfill below ball or roots. <br />(2) Width or Diameter: 2 ft. greater than diameter of plating ball <br />(unless otherwise approved by Landscape Architect for special <br />planting areas. <br /> <br />02490-7 <br /> <br />03-4138.8 <br />