My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2005-851
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2005
>
Reso 2005-851
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 10:32:50 AM
Creation date
1/25/2006 1:58:01 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2005-851
Date (mm/dd/yyyy)
11/17/2005
Description
– Agmt w/Calvin Giordano re: Atlantic Ave. Roadway & Drainage Improvemnts
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Work Authorization No. 52 <br />September 27, 2005 <br />Calvin, Giordano & Associates, Inc, Proposal No, 05-4893 <br /> <br />CITY OF SUNNY ISLES BEACH <br />Atlantic Avenue Roadwav and Drainae:e ImDrovements <br /> <br />PROJECT DESCRIPTION: <br /> <br />1. SCOPE OF SERVICES <br /> <br />I. Professional Land Surveying Services <br /> <br />A. Design Survey <br /> <br />Determine existing roadway elevations within right-of-way and adjacent to <br />right-of-way, and locate existing driveways, structures, fencing, trees and other <br />physical features as specified by the engineer. Prepare easement survey for <br />FP&L underground electrical conduit. Prepare CADD base file with all <br />information relevant to roadway engineering design and easement. <br /> <br />II. Professional Civil Engineering Services <br /> <br />A. Preliminary Investigation <br /> <br />Visit and inspect site to determine existing conditions. Take photographs, make <br />written documentation, sketches, notes and research specific codes, regulations <br />and requirements, Collect all existing as-builts. Attend one (1) meeting with <br />the City to discuss the City's plans for the roadway layout. Coordinate with all <br />governmental agencies that have jurisdiction over the site. <br /> <br />B. Preliminary Design <br /> <br />Prepare a preliminary layout of the proposed roadway, underground drainage, and <br />underground electrical conduit for presentation to the City. Attend one (1) <br />meeting to go over the City's comments. Revise the preliminary plans per the <br />City's comments. <br /> <br />C. Design Phase <br /> <br />Prepare proposed engineering roadway, underground drainage, underground <br />electrical conduit design for Atlantic Avenue while taking into account location <br />of existing driveways, sidewalks, right-of-way lines, trees, structures and <br />existing grades. <br /> <br />D. Final Civil Engineering Services <br /> <br />Prepare construction drawings and specifications including paving, grading, <br />drainage, and underground electrical conduit plans in accordance with all <br />applicable codes. Secure all necessary approvals for construction of project <br />with Miami-Dade Public Works, FDOT, Miami-Dade County Environmental <br />Resource Management District, Miami-Dade County Water and Sewer <br />Department and the City of Sunny Isles Beach. Perform all work incidentals to <br />design of layout. Provide engineering drawings at time of technical <br />compliance. During bidding phases, any Requests for Information (RFI's) shall <br />be responded to, bids shall be opened, tabulated and recommendations shall be <br />made. <br /> <br />P:\Proposals\2005 Proposals\054893 SIB Atlantic Ave Roadway and Drainage Improvements Rev.doc <br /> <br />SIB <br />
The URL can be used to link to this page
Your browser does not support the video tag.