Laserfiche WebLink
<br />Work Authorization No. 52 <br />September 27, 2005 <br />Calvin, Giordano & Associates, Inc. Proposal No. 05-4893 <br /> <br />CITY OF SUNNY ISLES BEACH <br />WORK AUTHORIZATION ESTIMATE SEPTEMBER 27,2005 <br />WORK AUTHORIZATION NO. #52 <br /> <br />PROJECT NAME <br /> <br />Atlantic A venue Roadway and Drainage Improvements <br />CGA Proposal No. 05-4893 <br />Surveying, Engineering Design, and Construction Services shall be <br />performed for the Atlantic A venue Roadway and Drainage Improvements. <br /> <br />DESCRIPTION <br /> <br />ESTIMATED DESIGN TIME: 2 Months <br />ESTIMATED PLANS REVIEW <br />TIME: 2 Weeks <br />ESTIMATED PERMITTING TIME: 2 Months <br />ESTIMATED BIDDING, <br />SELECTION, & LETTING TIME: 4 Months <br />ESTIMATED CONSTRUCTION <br />TIME: 4 Months <br />ESTIMATED CONSTRUCTION <br />COST: $362,100.00 <br /> <br />TITLE RATE HOURS COST <br />PROJECT MANAGER $120.00 8 $960.00 <br />PROJECT ENGINEER $100.00 40 $4,000.00 <br />ENGINEER CADD TECHNICIAN $70.00 120.00 $8,400.00 <br />SENIOR REGISTERED SURVEYOR $90.00 5.00 $450.00 <br />SURVEY COORDINATOR $80.00 9.00 $720.00 <br />SURVEY CADD TECHNICIAN $70.00 38.00 $2,660.00 <br />SURVEY CREW $95.00 68.00 $6,460.00 <br />PERMIT ADMINISTRATOR $70.00 8.00 $560.00 <br />CLERICAL $60.00 4.00 $240.00 <br />RESIDENT INSPECTOR $110.00 117.00 $12,870.00 <br /> <br />FP&L EASEMENT <br />FP&L DESIGN <br /> <br />$3,164.00 <br />$15,000.00 <br /> <br />LABOR SUBTOTAL <br />REIMBURSABLE SUBTOTAL <br />TOTAL <br /> <br />$55,484.00 <br />$2,770.00 <br />$58,254.00 <br /> <br />Reviewed By: <br /> <br />Christopher Russo, City Manager <br /> <br />P:\Proposals\2005 Proposals\05-4893 SIB Atlantic Ave Roadway and Drainage Improvements Rev.doc <br /> <br />SIR <br />