My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1099
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1099
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:42:09 AM
Creation date
6/20/2007 1:37:29 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1099
Date (mm/dd/yyyy)
05/17/2007
Description
Agmt w/ IBM: RFP Requirements Prep for Construction of Wireless Island
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Statement of Work <br /> <br />This Statement of Work ("SOW") defines the scope of work to be accomplished by IBM under the <br />terms and conditions of the IBM Customer Agreement (or any equivalent agreement signed by <br />both of us) ("Agreement"). The tasks to be performed by IBM are defined and an Estimated <br />Schedule is provided. In addition, the responsibilities of City of Sunny Isles Beach are listed. <br /> <br />The Statement of Work includes the following subsections: <br /> <br />. Scope of Services <br />. Key Assumptions <br />. IBM Responsibilities <br />. City of Sunny Isles Beach Responsibilities <br />. Estimated Schedule <br />. Deliverable Materials <br />. Completion Criteria <br />. Charges <br />. Other Terms and Conditions <br /> <br />Changes to this Statement of Work will be processed in accordance with the procedure described <br />in Appendix C, "Project Change Control Procedure". The investigation and the implementation of <br />changes may result in modifications to the Estimated Schedule, Charges, or other terms of this <br />Statement of Work. <br /> <br />The following are incorporated in and made part of this Statement of Work: <br /> <br />. Appendix A, "Deliverable Guidelines" <br />. Appendix B, "Deliverable Material Acceptance Process" <br />. Appendix C, "Project Change Control Procedure" <br /> <br />1 Scope of Services <br /> <br />The scope of the project is to develop and document the City of Sunny Isles Beach Wireless <br />Network requirements with the City of Sunny Isles Beach guidance. <br /> <br />1.1 Key Assumptions <br /> <br />This Statement of Work and IBM's estimates to perform are based on the following key <br />assumptions. Deviations that arise during the proposed project will be managed through the <br />procedure described in Appendix C, "Project Change Control Procedure". <br /> <br />1. This Statement of Work addresses only the City of Sunny Isles Beach iocation(s) at the <br />City of Sunny Isles Beach. <br />2. IBM will only be providing technical, procedural and qualifications that can be incorporated <br />into a more complete document that includes other City of Sunny Isles Beach provisions <br />such as legal, insurance, and other internal city requirements. <br /> <br />2 IBM Responsibilities <br /> <br />The specific Services to be provided under this Statement of Work are described in this section. <br /> <br />2.1 IBM General Responsibilities <br /> <br />1. IBM will provide Services under this Statement of Work during normal business hours, <br />8:00 a.m. to 5:00 p.m. (local time) Monday through Friday, except IBM holidays, unless <br />otherwise specified. <br /> <br />Page 2 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.