My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1155
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1155
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:42:16 AM
Creation date
9/28/2007 9:42:37 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
Reso 2007-115
Date (mm/dd/yyyy)
09/20/2007
Description
Playground Equip Purch Agrmt w-Superior Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />· A date certain by which the project must be completed. <br /> <br />· Include an updated catalog, if needed, and updated MSRP lists for the park and play equipment specifically quoled. <br /> <br />The City will generate purchase orders as a result of approved "Request For Quotations" submitted, at the sole discretion of the City. <br />The City reserves the right to not award to any, or to go outside the contract 10 award. <br /> <br />PROMOTIONAL PRICING: <br />During the contract period, bidders will extend any pricing offered on a "promotional" basis from the manufacturer to the City. It will <br />be the bidder's responsibility to monitor said items and report any that are or will be offered at lower prices. <br /> <br />F.O.B. POINT (FREIGHT): <br />On any Request For Quotation, the City will indicate the exact installation point. The bidder must then set freight charges, offering <br />F.O.B. delivered. This price will be indicated on any purchase order issued. Bidders are responsible for supplying all labor, materials, <br />and equipment required for the off-loading and placement of items as directed at all delivery locations, without the assistance of City <br />of Jacksonville personnel. Additionally, bidder will arrange for and be responsible for any storage of materials and equipment <br />received. <br /> <br />PERMITS, FEES AND NOTIFICATIONS: <br />It shall be the bidder's responsibility to secure and pay for any and all permits that may be required to accomplish the work <br />associated with the performance of these Bid Specifications. The City will not honor any request for payment of permits. <br /> <br />PA YMENT: <br />Price agreement contracts will be issued only to the vendor/manufacturer who submitted an awarded bid proposal. No split order <br />payments separating equipment vendor payment from installer payment will be issued by the City of Jacksonville. Payment for <br />installation charges will be the responsibility of the bidder. Payment for both equipment and installation will be made only upon <br />completion of the entire scope of work and subsequent acceptance by the City of Jacksonville. <br /> <br />WARRANTY: <br />The successful bidder shall fully warrant, in writing within 30 days of final acceptance by City, all furnished or furnished/installed <br />equipment to be free of defects in materials and/or workmanship for a period of at least one (I) year from date of installation and <br />acceptance by City of Jacksonville. Successful bidder shall repair and/or replace, at no additional cost to City of Jacksonville, any <br />defects or malfunctions noted during the warranty period. In addition, successful bidder shall transfer any manufacturer's guarantee to <br />the City, in writing within 30 days of final acceptance by City, for supplier/installer furnished equipment extending beyond this <br />contract period. <br /> <br />SUPERVISION: <br />A bidder job supervisor/representative will be on the work site at all times and be thoroughly knowledgeable of the materials, job <br />requirements, plans, specifications and installation functions. <br /> <br />JOB COMPLETION: <br />Bidder/contractor/installer will be responsible for all materials received and signed for from date of order to completion of job <br />installation. <br /> <br />Bidder/installer will be responsible for clean up and removal of all debris resulting in job completion, leaving work site in neat and <br />orderly fashion at the end of each workday. Additionally, bidder/installer will be responsible for restoring the work site to its original <br />condition at the completion of the project. <br /> <br />RESPONSIBILITY FOR DAMAGES AND PRESERVATION OF PROPERTY: <br />The bidder shall use due care to avoid damaging all property associated with, adjacent to, or in any way afTected by the work being <br />performed. This applies 10 private property as well as public property and all utilities which may exist within the work area. Any <br />damage occurring to such items by bidder shall be immediately repaired or replaced to a condition at least equal to that which existed <br />prior to the damage. All costs incurred for repair or replacement shall be borne by bidder. Any damages not repaired or replaced by <br />the bidder within ten (10) calendar days from notification wi!! be fixed by the City or ils contractor, and the cost shall be paid by ihe <br />bidder or deducted from their invoice. <br /> <br />VIOLA TIONS/DEFAULT: <br />In the event the awarded bidder(s) should violate any provisions of this bid, such bidder will be given written notice stating the <br />deficiencies and given ten (10) days to correct deficiencies found. The City reserves the right to terminate any contracl at any time <br />due to ;.my violation. <br /> <br />In the event tilt: ;l\vanJed bidder(s) should breach this contract, the City reserves lhe right to seek all remedies in law ;md/or in equity. <br />
The URL can be used to link to this page
Your browser does not support the video tag.