Laserfiche WebLink
r <br />n111-l" <br />U <br />r <br />17 <br />III <br />Item No. 2711- <br />33- <br />Skip Traffic Stripe (White) - per meter. <br />Item No. 711- <br />34- <br />Skip Traffic Stripe (Yellow) - per foot. <br />Item No. 2711- <br />34- <br />Skip Traffic Stripe (Yellow) - per meter. <br />Item No. 711- <br />35- <br />Solid Traffic Stripe (White) - per foot. <br />Item No. 2711- <br />35- <br />Solid Traffic Stripe (White) - per meter. <br />Item No. 711- <br />36- <br />Solid Traffic Stripe (Yellow) - per foot. <br />Item No. 2711- <br />36- <br />Solid Traffic Stripe (Yellow) - per meter. <br />Item No. 711- <br />37- <br />Solid Traffic Stripe (White) - per net mile. <br />Item No. 2711- <br />37- <br />Solid Traffic Stripe (White) - per net kilometer. <br />Item No. 711- <br />38- <br />Solid Traffic Stripe (Yellow) - per net mile. <br />Item No. 2711- <br />38- <br />Solid Traffic Stripe (Yellow) - per net kilometer. <br />Item No. 710- <br />21- <br />Skip Traffic Stripe (White /Black) - per gross mile. <br />Item No. 2710- <br />21- <br />Skip Traffic Stripe (White /Black) - per gross kilometer. <br />Item No. 710- <br />22- <br />Skip Traffic Stripe (Yellow) - per gross mile. <br />Item No. 2710- <br />22- <br />Skip Traffic Stripe (Yellow) - per gross kilometer. <br />Item No. 710- <br />23- <br />Solid Traffic Stripe (White /Black) - per net mile. <br />Item No. 2710- <br />23- <br />Solid Traffic Stripe (White /Black) - per net kilometer. <br />Item No. 710- <br />24- <br />Solid Traffic Stripe (Yellow) - per net mile. <br />Item No. 2710- <br />24- <br />Solid Traffic Stripe (Yellow) - per net kilometer. <br />Item No. 710- <br />25- <br />Solid Traffic Stripe (White /Black) - per foot. <br />Item No. 2710- <br />25- <br />Solid Traffic Stripe (White /Black) - per meter. <br />Item No. 710- <br />26- <br />Solid Traffic Stripe (Yellow) - per foot. <br />Item No. 2710- <br />26- <br />Solid Traffic Stripe (Yellow) - per meter. <br />Item No. 710- <br />6- <br />Directional Arrows, Painted - each. <br />Item No. 2710- <br />6- <br />Directional Arrows, Painted - each. <br />Item No. 710- <br />7- <br />Pavement Messages, Painted - each. <br />Item No. 2710- <br />7- <br />Pavement Messages, Painted - each. <br />104 PREVENTION, CONTROL AND ABATEMENT OF EROSION AND WATER <br />POLLUTION. <br />(REV 5- 24 -04) (FA 7- 13 -04) (1 -05) <br />ARTICLE 104 -5 (Pages 123-125) is deleted and the following substituted: <br />104 -5 Preconstruction Requirements. <br />At the Preconstruction Conference, provide to the Department an Erosion Control <br />Plan meeting the requirements or special conditions of all permits authorizing project <br />construction. If no permits are required or the approved permits do not contain special <br />conditions or specifically address erosion and water pollution, the project Erosion Control <br />Plan will be governed by 7-1.1, 7 -2.2, 7 -8.1, 7 -8.2, and Section 104. <br />When a DEP generic permit is issued, the Contractor's Erosion Control Plan shall be <br />prepared to accompany the Department's Stormwater Pollution Prevention Plan (SWPPP). <br />Ensure the Erosion Control Plan includes procedures to control off -site tracking of soil by <br />vehicles and construction equipment and a procedure for cleanup and reporting of <br />non -storm water discharges, such as contaminated groundwater or accidental spills. Do <br />not begin any soil disturbing activities until Department approval of the Contractor's <br />Erosion Control Plan, including required signed certification statements. <br />March 2007 01000 -18 <br />n <br />03- 4122.D <br />