My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1103
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2015 2:31:40 PM
Creation date
10/29/2007 11:00:34 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1103
Date (mm/dd/yyyy)
05/17/2007
Description
SR826 Project Bid Award & Agrmt w-Williams Paving (Bid# 07-03-02 $2,863,958.70)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d1l <br />G <br />I <br />N11 <br />1 is <br />1P <br />r <br />Failure to sign any required documents or certification statements will be considered <br />a default of the Contract. Any soil disturbing activities performed without the required <br />signed documents or certification statements may be considered a violation of the DEP <br />Generic Permit. <br />When the SWPPP is required, prepare the Erosion Control Plan in accordance with <br />the planned sequence of operations and present in a format acceptable to the Department. <br />The Erosion Control Plan shall describe, but not be limited to, the following items or <br />activities: <br />(1) For each phase of construction operations or activities, supply the <br />following information: <br />(a) Locations of all erosion control devices <br />(b) Types of all erosion control devices <br />(c) Estimated time erosion control devices will be in operation <br />(d) Monitoring schedules for maintenance of erosion control devices <br />(e) Methods of maintaining erosion control devices <br />(f) Containment or removal methods for pollutants or hazardous <br />wastes <br />(2) The name and telephone number of the person responsible for monitoring <br />and maintaining the erosion control devices. <br />(3) Submit for approval the Erosion Control Plans meeting paragraphs 3a, 3b, <br />or 3c below: <br />(a) Projects permitted by the Southwest Florida Water Management <br />District (SWFWMD), require the following: <br />Submit a copy of the Erosion Control Plan to the Engineer for <br />review and to the appropriate SWFWMD Office for review and approval. Include the <br />SWFWMD permit number on all submitted data or correspondence. <br />The Contractor may schedule a meeting with the appropriate <br />SWFWMD Office to discuss his Erosion Control Plan in detail, to expedite the review and <br />approval process. Advise the Engineer of the time and place of any meetings scheduled <br />with SWFWMD. <br />Do not begin construction activities until the Erosion Control <br />Plan receives written approval from both SWFWMD and the Engineer. <br />(b) Projects permitted by the South Florida Water Management <br />District or the St. Johns River Water Management District, require the following: <br />Obtain the Engineer's approval of the Erosion Control Plan. <br />Do not begin construction activities until the Erosion Control <br />Plan receives written approval from the Engineer. <br />(c) Projects authorized by permitting agencies other than the Water <br />Management Districts or projects for which no permits are required require the following: <br />The Engineer will review and approve the Contractor's Erosion <br />Control Plan. <br />Do not begin construction activities until the Erosion Control <br />Plan receives written approval from the Engineer. <br />Comply with the approved Erosion Control Plan. <br />r� <br />March 2007 01000 -19 03- 4122.D "� <br />
The URL can be used to link to this page
Your browser does not support the video tag.