My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1103
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2015 2:31:40 PM
Creation date
10/29/2007 11:00:34 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1103
Date (mm/dd/yyyy)
05/17/2007
Description
SR826 Project Bid Award & Agrmt w-Williams Paving (Bid# 07-03-02 $2,863,958.70)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
all bridge construction and related activities (casting yard, etc.) if compliance is not met <br />within 60 days, regardless of how much effort is put forth. Resume bridge construction <br />operations only after written approval from the Engineer stating that compliance is <br />reestablished. <br />105 -5.9 Prestressed Concrete Plant Facility Quality Control Personnel: Ensure each <br />plant has an on site production manager, an on site Facility Manager for Quality Control, a <br />plant engineer, and adequate on site QC inspectors /technicians to provide complete QC <br />inspections and testing. <br />Ensure the Facility Manager for Quality Control has at least five years of <br />related experience and a current PCI QC personnel Level III certification and a certificate of <br />completion of Section 450 Specification examination. Ensure that the QC <br />inspector /technician has current PCI QC Technician /Inspector Level II certification and a <br />certificate of completion of Section 450 Specification examination. Department certified <br />prestressed concrete inspectors are exempt from PCI Level II certification and from <br />completion of Section 450 Specification examination, until the time of expiration of their <br />certificates. Facility Managers for Quality Control certified by the Department as <br />prestressed concrete inspectors are exempt from PCI Level III certification and from <br />completion of Section 450 Specification examination, until the time of expiration of their <br />certificates. <br />105 -5.10 Signal Installation Inspector: Provide an inspector trained and certified by <br />the International Municipal Signal Association (IMSA) as a Traffic Signal Inspector to <br />perform all signal installation inspections. Use only Department approved signal inspection <br />report forms during the signal inspection activities. Ensure all equipment, materials, and <br />hardware is in compliance with Department Specifications and verify that all equipment <br />requiring certification is listed on the Department's Approved Product List (APL). Provide <br />the completed signal inspection report form(s), certified by the IMSA Traffic Signal <br />Inspector to the Engineer. <br />The Department's approved inspection report forms are available at the <br />following URL: www. dot .state.f1.us /trafficoperations/ . <br />105 -5.11 Incidental Precast Concrete Manufacturing Facilities: Incidental precast <br />concrete products include, concrete barrier walls, sound barriers, retaining wall panels, and <br />prestressed concrete poles. Ensure there are adequate on site qualified personnel to <br />perform the quality control inspections and testing. <br />Ensure the quality control manager has at least three years of quality control <br />experience, directly related to cement concrete production and a current CTQP Concrete <br />Field Technician Level I qualification. Ensure the quality control inspectors /technicians are <br />currently certified as CTQP Concrete Field Technician Level I. <br />105 -5.12 Structural Steel and Miscellaneous Metals Fabrication Facility Quality <br />Control Personnel: Ensure each fabrication facility has an on site production manager, an <br />on site facility manager for QC, a plant engineer, and on site QC inspectors /technicians to <br />provide complete QC inspections and testing. <br />Ensure that the facility manager for quality control and QC <br />inspectors /technicians meet the certification requirements set forth in the latest version of <br />AASHTO /NSBA Steel Bridge Collaboration S 4.1, Steel Bridge Fabrication QC /QA Guide <br />Specification, including the years of experience required in Table 105 -5 below. The facility <br />manager for QC must meet the requirements of Table 105 -5 for every Structural Steel <br />Member Type produced by a plant with QC being managed by the facility manager of QC. <br />The facility manager of QC will report directly to the plant manager or plant engineer and <br />March 2007 01000 -27 03- 4122.D <br />
The URL can be used to link to this page
Your browser does not support the video tag.