Laserfiche WebLink
I <br />vlr� <br />0 <br />N <br />must not be the plant production manager nor report to or be the subordinate of the plant <br />production manager. QC inspectors /technicians must be the employees of, and must report <br />directly to the facility manager of QC. <br />TABLE 105 -5 <br />Experience Requirements for QC Inspectors /Technicians <br />And Facility Manager for Quality Control <br />Structural Steel Member Type <br />Minimum Years of Experience Required <br />QC Inspector /Technician Facility Manager for QC <br />Rolled beam bridges <br />1 year <br />3 years <br />Welded plate girders (12 <br />y ears <br />4 ears <br />y <br />sections, box sections, etc.) <br />Complex structures, such as <br />trusses, arches, cable stayed3 <br />years <br />5 years <br />bridges, and moveable bridges <br />Fracture critical (FC) members <br />3 years <br />15 years <br />110 REMOVAL OF EXISTING STRUCTURES. <br />(REV 1 -3 -06) (FA 3 -8 -06) (7 -06) <br />SUBARTICLE 110-6 (Pages 141 and 142) is deleted and the following substituted: <br />110 -6 Removal of Existing Structures. <br />110 -6.1 Structures to be Removed: Remove and dispose of the materials from <br />existing structures. Remove the following: (1) those structures, or portions of structures, <br />shown in the plans to be removed; (2) those structures, or portions of structures, found <br />within the limits of the area to be cleared and grubbed, and directed by the Engineer to be <br />removed; (3) those structures, or portion of structures, which are necessary to be removed <br />in order to construct new structures; and (4) other appurtenances or obstructions which <br />may be designated in the Contract Documents as to be included in an item of payment for <br />the work under this Article. <br />Notify the Florida Department of Environmental Protection (DEP) using DEP <br />Form 62- 257.900(1) "Notice of Asbestos Renovation or Demolition" at least 10 working <br />days prior to the demolition or renovation of any structures, even if asbestos is not found <br />on the project. Provide a copy of this notice to the Engineer. <br />110 -6.2 Method of Removal: <br />110 -6.2.1 General: Remove the structures in such a way so as to leave no <br />obstructions to any proposed new structures or to any waterways. Pull, cut off, or break <br />off pilings to the requirements of the permit or other Contract Documents, whichever <br />requires the deepest removal, but not less than 2 feet [0.6 m] below the finish ground line. <br />In the event that the plans indicate channel excavation to be done by others, consider the <br />finish ground line as the limits of such excavation. For materials which are to remain the <br />property of the Department or are to be salvaged for use in temporary structures, avoid <br />q r <br />March 2007 01000 -28 03- 4122.D <br />