Laserfiche WebLink
fl � 711 <br />1 <br />test, the Engineer will collect the remaining Verification split samples for testing. <br />Verification Test results will be used for material acceptance purposes for the eight LOTS in <br />question. <br />160 -7.4.4 Density: When a Verification or Independent Verification density <br />test does not meet 160 -7.2.3 (Acceptance Criteria), retest the LOT at a site within a <br />5 feet [1.5 meter] radius of the Verification test location and observe the following: <br />1. If the Quality Control retest meets the Acceptance Criteria and <br />compares favorably with the Verification or Independent Verification test, the Engineer will <br />accept the four LOTs in question. <br />2. If the Quality Control retest does not meet the Acceptance Criteria <br />and compares favorably with the Verification or Independent Verification test, rework and <br />retest the material in that LOT. The Engineer will re- verify the four LOTs in question. <br />3. If the Quality Control retest and the Verification or Independent <br />Verification test do not compare favorably, complete a new equipment- comparison analysis <br />as defined in 120-10.1.2. Once acceptable comparison is achieved, retest the four LOTs. <br />The Engineer will perform new verification testing. Acceptance testing will not begin on a <br />new LOTs until the Contractor has a gauge that meets the comparison requirements. <br />163 BLANKET MATERIAL. <br />(REV 9 -7 -05) (FA 1- 10 -06) (7 -06) <br />SECTION 163 (Pages 190 and 19 1) is deleted. <br />200 ROCK BASE. <br />(REV 8 -2 -05) (FA 8 -3 -05) (8 -05) <br />ARTICLE 200 -6 (Pages 194-195) is deleted and the following substituted: <br />200 -6 Compacting and Finishing Base. <br />200 -6.1 General: A LOT is defined as a single lift of finished base not to exceed <br />500 feet [150 m]. Shoulders compacted separately shall be considered separate LOTS. <br />Isolated compaction operations will be considered as separate LOTS. For multiple phase <br />construction, a LOT shall not extend beyond the limits of the phase. <br />200 -6.1.1 Single Course Base: After spreading, scarify the entire surface, <br />then shape the base to produce the required grade and cross - section, free of scabs and <br />laminations, after compaction. <br />200 -6.1.2 Multiple Course Base: Clean the first course of foreign material, <br />then blade and bring it to a surface cross - section approximately parallel to the finished <br />base. Before spreading any material for the upper courses, allow the Engineer to make <br />density tests for the lower courses to determine that the required compaction has been <br />obtained. After spreading the material for the top course, scarify finish and shape its <br />surface to produce the required grade and cross - section, free of scabs and laminations, <br />after compaction. <br />March 20117 01000 -40 03- 4122.D " �; <br />