My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1103
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2015 2:31:40 PM
Creation date
10/29/2007 11:00:34 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1103
Date (mm/dd/yyyy)
05/17/2007
Description
SR826 Project Bid Award & Agrmt w-Williams Paving (Bid# 07-03-02 $2,863,958.70)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�Ll <br />200 -6.2 Moisture Content: When the material does not have the proper moisture <br />content to ensure the required density, wet or dry it as required. When adding water, <br />uniformly mix it in to the full depth of the course that is being compacted. During wetting <br />or drying operations, manipulate, as a unit, the entire width and depth of the course that is <br />being compacted. <br />200 -6.3 Thickness Requirements: Within the entire limits of the length and width of <br />the finished base, meet the specified plan thickness in accordance with the requirements of <br />200 -7.3.1 .2. <br />200 -6.4 Correction of Defects: <br />200 -6.4.1 Contamination of Base Material: If, at any time, the subgrade <br />material becomes mixed with the base course material, dig out and remove the mixture, <br />and reshape and compact the subgrade. Then replace the materials removed with clean <br />base material, and shape and compact as specified above. Perform this work at no expense <br />to the Department. <br />200 -6.4.2 Cracks and Checks: If cracks or checks appear in the base, either <br />before or after priming, which, in the opinion of the Engineer, would impair the structural <br />efficiency of the base, remove the cracks or checks by rescarifying, reshaping, adding base <br />material where necessary, and recompacting. <br />200 -6.5 Compaction of Widening Strips: Where base construction consists of <br />widening strips and the trench width is not sufficient to permit use of standard base <br />compaction equipment, compact the base using vibratory compactors, trench rollers or <br />other special equipment which will achieve the density requirements specified herein. <br />When multiple course base construction is required, compact each course <br />prior to spreading material for the overlaying course. <br />ARTICLE 200 -7 (Pages 195 -198) is deleted and the following substituted: <br />200 -7 Acceptance Program. <br />200 -7.1 General Requirements: Meet the requirements of 120 -10.1, except use <br />200 -7.2 instead of 120 -10.2. <br />200 -7.2 Acceptance Criteria: <br />200 -7.2.1 Density: Within the entire limits of the width and depth of the <br />base, obtain a minimum density in any LOT of 98% of modified Proctor maximum density <br />as determined by AASHTO FM 1 -T 180, Method D. Compact the base of any LOT of <br />shoulder pavement to not less than 95% of the modified Proctor maximum density as <br />determined by FM 1 -T 180, Method D. <br />200 -7.2.2 Frequency: Conduct QC sampling and testing at a minimum <br />frequency listed in the table below. The Engineer will perform Verification sampling and <br />tests at a minimum frequency listed in the table below. <br />March 2007 01000 -41 03- 4122.D <br />
The URL can be used to link to this page
Your browser does not support the video tag.