u <br />r <br />334 -3.3 Mix Design Revisions: During production, the Contractor may request a <br />target value revision to a mix design, subject to meeting the following requirements: (1) <br />the target change falls within the limits defined in Table 334 -3, (2) appropriate data exists <br />demonstrating that the mix complies with production air voids specification criteria, and (3) <br />the mixture gradation meets the basic gradation requirements defined in 334 - 3.2.2. <br />Table 334 -3 <br />Limits for Potential Adjustments to Mix Design Target Values <br />Characteristic <br />Limit from Original Mix Design <br />No. 8 sieve [2.36 mm] and Coarser <br />± 5.0 percent <br />No. 16 sieve [1.18 mm] <br />± 4.0 percent <br />No. 30 sieve [600pm] <br />± 4.0 percent <br />No. 50 sieve [300,um] <br />± 3.0 percent <br />No. 100 sieve [150 /im] <br />± 3.0 percent <br />No. 200 sieve [75 ,um] <br />± 1.0 percent <br />Asphalt Binder Content (1) <br />± 0.3 percent <br />(1) Reductions to the asphalt binder content will not be permitted if the VMA during <br />production is lower than 1 .0 percent below the design criteria. <br />Submit all requests for revisions to mix designs, along with supporting <br />documentation, to the Engineer. In order to expedite the revision process, the request for <br />revision or discussions on the possibility of a revision may be made verbally, but must be <br />followed up by a written request. The verified mix design will remain in effect until the <br />Engineer authorizes a change. In no case will the effective date of the revision be <br />established earlier than the date of the first communication between the Contractor and <br />the Engineer regarding the revision. <br />A new design mix will be required if aggregate sources change, or for any <br />substitution of an aggregate product with a different aggregate code, unless approved by <br />the Engineer. <br />Ul 334 -4 Contractor Process Control. <br />Assume full responsibility for controlling all operations and processes such that the <br />requirements of these Specifications are met at all times. Perform any tests necessary at <br />the plant and roadway for process control purposes. The Engineer will not use these test <br />results in the acceptance payment decision. <br />Address in the Quality Control Plan how Process Control failures will be handled. <br />Investigate, at a minimum, the production process, testing equipment and /or sampling <br />methods to determine the cause of the failure, and make any necessary changes to assure <br />compliance with these Specifications. Obtain a follow up sample immediately after <br />corrective actions are taken to assess the adequacy of the corrections. In the event the <br />follow -up Process Control sample also fails to meet Specification requirements, cease <br />production of the asphalt mixture until the problem is adequately resolved to the <br />satisfaction of the Engineer. <br />334 -5 Acceptance of the Mixture. <br />334 -5.1 General: The mixture will be accepted at the plant with respect to <br />gradation (P -a and P -Zoo), asphalt content (Pb), and volumetrics (volumetrics is defined as air <br />P n ., <br />March 2007 01000 -58 03- 4122.D �,;. <br />