My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1103
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2015 2:31:40 PM
Creation date
10/29/2007 11:00:34 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1103
Date (mm/dd/yyyy)
05/17/2007
Description
SR826 Project Bid Award & Agrmt w-Williams Paving (Bid# 07-03-02 $2,863,958.70)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />I <br />I <br />I <br />I <br />I <br />ud <br />I <br />I <br />I <br />I <br />!!'ll <br />voids at Nde59.). The mixture will be accepted on the roadway with respect to density of <br />roadway cores. Acceptance will be on a LOT -by -LOT basis (for each mix design) based on <br />tests of random samples obtained within each sublot taken at a frequency of one set of <br />samples per sublot. A roadway LOT and a plant production LOT shall be the same. <br />Acceptance of the mixture will be based on Contractor Quality Control test results that <br />have been verified by the Department. <br />334 -5.1.1 Sampling and Testing Requirements: Obtain the samples in <br />accordance with FM 1 -T 168. Obtain samples at the plant of a sufficient quantity to be <br />split into three smaller samples; one for Quality Control, one for Verification and one for <br />Resolution testing; each sample at approximately 35 pounds [16 kg]. The split samples for <br />Verification testing and Resolution testing shall be reduced in size and stored in three <br />boxes each. The approximate size of each box must be 12" x 8" x 4 ". Label and safely <br />store these boxes in a manner agreed upon by the Engineer for future testing. The <br />Contractor can retain additional split samples at their option. <br />The asphalt content of the mixture will be determined in accordance <br />with FM 5 -563. In the event the FM 5 -563 ignition oven goes out of service during <br />production, the Contractor may elect to use a replacement oven at another location for no <br />more than 72 hours while the oven is being repaired. The gradation of the recovered <br />aggregate will be determined in accordance with FM 1 -T 030. Volumetric testing will be in <br />accordance with AASHTO T312 -04 and FM 1 -T 209. Prior to testing volumetric samples, <br />condition the test -sized sample for one hour at the target roadway compaction temperature <br />in a covered, shallow, flat pan. Test for roadway density in accordance with FM 1 -T 166, <br />334 -5.1.2 Acceptance Testing Exceptions: When the total quantity of any <br />mix type in the Project is less than 500 tons [500 metric tons], the Engineer will accept <br />the mix on the basis of visual inspection. The Engineer may require the Contractor to run <br />process control tests for informational purposes, as defined in 334 -4, or may run <br />independent verification tests to determine the acceptability of the material. <br />Density testing for acceptance will not be performed on widening <br />strips or shoulders with a width of 5 ft. [1.5 m] or less, open - graded friction courses, <br />variable thickness overbuild courses, leveling courses, first lift of asphalt base course <br />placed on subgrade, miscellaneous asphalt pavement, or any course with a specified <br />thickness less than 1 inch [25 mm] or a specified spread rate that converts to less than <br />1 inch [25 mm] as described in 334-1.4. In addition, density testing for acceptance will not <br />be performed on the following areas when they are less than 1 ,000 feet [300 m] in length: <br />crossovers, intersections, turning lanes, acceleration lanes, deceleration lanes, or ramps. <br />Compact these courses (with the exception of open - graded friction courses) in accordance <br />with the rolling procedure (equipment and pattern) submitted as part of the Quality Control <br />Plan and as approved by the Engineer. In the event that the rolling procedure deviates from <br />the approved procedure, placement of the mix shall be stopped. <br />The density pay factor (as defined in 334 -8.2) for LOTs where there <br />are areas not requiring density testing for acceptance will be prorated based on a pay <br />factor of 1 .00 for the quantity (tonnage) of material in areas not requiring density testing <br />for acceptance and the actual pay factor for the tonnage of material in areas requiring <br />density. <br />334 -5.2 LOT Sizes: LOT sizes will be either 2,000 tons [2,000 metric tons] or <br />4,000 tons [4,000 metric tons]. The Initial Production LOT of all mix designs used on a <br />project shall consist of 2,000 tons [2,000 metric tons], subdivided into four equal sublots <br />of 500 tons [500 metric tons] each. Following the Initial Production LOT, each remaining <br />01 March 2007 01000 -59 03- 4122.D; <br />
The URL can be used to link to this page
Your browser does not support the video tag.