Laserfiche WebLink
0 <br />u <br />m <br />Iliti� <br />iJ <br />I� <br />in accordance with 337 -9, immediately make all corrections necessary to bring the spread <br />rate into the acceptable range. <br />337 -6 Acceptance of the Mixture. <br />337 -6.1 FC -9.5 and FC -12.5: Meet the requirements of 334 -5. <br />337 -6.2 FC -5: Meet the requirements of 334 -5 with the following exceptions: <br />1 . The mixture will be accepted with respect to gradation (P -3i8, P -4, and P -s), <br />and asphalt binder content (Pb) only. <br />2. Testing in accordance with AASHTO T312 -04 and FM 1 -T 209 (and <br />conditioning prior to testing) will not be required as part of 334 -5.1.1 . <br />3. The standard LOT size of FC -5 will be 2,000 tons [2,000 metric tons], <br />with each LOT subdivided into four equal sublots of 500 tons [500 metric tons] each. <br />4. Initial production requirements of 334 -5.3 do not apply. <br />5. The Between - Laboratory Precision Values described in Table 334 -5 are <br />modified to include (P -3/9, P -4, and P -e) with a maximum difference per FM 1 -T 030 <br />(Figure 2). <br />6. Table 334 -4 (Master Production Range) is replaced by Table 337 -2. <br />7. The mixture will be accepted on the roadway with respect to surface <br />tolerance in accordance with the applicable requirements of 334 -5.8. No density testing <br />will be required for these mixtures. <br />Table 337 -2 <br />FC -5 Master Production Range <br />Characteristic <br />Tolerance (1) <br />Asphalt Binder Content ( %) <br />Target ± 0.60 <br />Passing 3/8 inch [9.50 mm] Sieve (%) <br />Target ± 7.50 <br />Passing No. 4 [4.75 mm] Sieve ( %) <br />Target ± 6.00 <br />Passing No. 8 [2.36 mm] Sieve ( %) <br />Target ± 3.50 <br />(1) Tolerances for sample size of n = 1 from the verified mix design <br />337 -6.2.1 Individual Test Tolerances for FC -5 Production: In the event that <br />an individual Quality Control test result of a sublot for gradation (P -sis, P -4, and P -a), does <br />not meet the requirements of Table 337 -2, take steps to correct the situation and report <br />them to the Engineer. <br />In the event that two consecutive individual Quality Control test <br />results for gradation (P -3i8, P -4, and P -a) or an individual test result for asphalt binder content <br />does not meet the requirements of Table 337 -2, the LOT will be automatically terminated <br />and production of the mixture stopped until the problem is adequately resolved (to the <br />satisfaction of the Engineer), unless it can be demonstrated to the satisfaction of the <br />Engineer that the problem can immediately be (or already has been) resolved. Address any <br />material represented by the failing test result in accordance with 334 - 5.9.5. <br />337 -7 Special Construction Requirements. <br />337 -7.1 Hot Storage of FC -5 Mixtures: When using surge or storage bins in the <br />normal production of FC -5, do not leave the mixture in the surge or storage bin for more <br />than one hour. <br />337 -7.2 Longitudinal Grade Controls for Open- Graded Friction Courses: On FC -5, <br />use either longitudinal grade control (skid, ski or traveling stringline) or a joint matcher. <br />March 2007 01000 -75 03- 4122.D :, <br />