Laserfiche WebLink
337 -7.3 Temperature Requirements for FC -5: <br />337 -7.3.1 Air Temperature at Laydown: Spread the mixture only when the <br />air temperature (the temperature in the shade away from artificial heat) is at or above 65 °F <br />[18 0C]. As an exception, place the mixture at temperatures lower than 65 °F [18 °C], only <br />when approved by the Engineer based on the Contractor's demonstrated ability to achieve <br />a satisfactory surface texture and appearance of the finished surface. In no case shall the <br />mixture be placed at temperatures lower than 60 °F [16 °C]. <br />337 -7.3.2 Temperature of the Mix: Heat and combine the asphalt rubber <br />binder and aggregate in a manner to produce a mix having a temperature, when discharged <br />from the plant, meeting the requirements of 330 -6.3. Meet all requirements of 330 -9.1.2 <br />at the roadway. The target mixing temperature shall be established at 320 °F [160 °C]. <br />337 -7.4 Compaction of FC -5: Provide two, static steel - wheeled rollers, with an <br />effective compactive weight in the range of 135 to 200 PLI [2.4 to 3.6 kg /mm], <br />determined as follows: <br />INon SI Units <br />PLI = <br />Total Weight of Roller (pounds) <br />Total Width of Drums (inches) <br />SI Units <br />k�/ _ Total Weight of Roller (kilograms) <br />i MM Total Width of Drums (millimete rs) <br />(Any variation of this equipment requirement must be approved by the Engineer.) Establish <br />an appropriate rolling pattern for the pavement in order to effectively seat the mixture <br />without crushing the aggregate. In the event that the roller begins to crush the aggregate, <br />reduce the number of coverages or the PLI of the rollers. If the rollers continue to crush the <br />aggregate, use a tandem steel -wheel roller weighing not more than 135 Win (PLI) <br />[2.4 kg /mm] of drum width. <br />337 -7.5 Temperature Requirements for FC -9.5 and FC -12.5: <br />337 -7.5.1 Air Temperature at Laydown: Spread the mixture only when the <br />air temperature (the temperature in the shade away from artificial heat) is at or above 45 °F <br />[7 °C]. <br />337 -7.5.2 Temperature of the mix: Heat and combine the asphalt rubber <br />binder and aggregate in a manner to produce a mix having a temperature, when discharged <br />from the plant, meeting the requirements of 330 -6.3. Meet all requirements of 330 -9.1.2 <br />at the roadway. <br />337 -7.6 Prevention of Adhesion: To minimize adhesion to the drum during the <br />rolling operations, the Contractor may add a small amount of liquid detergent to the water <br />in the roller. <br />At intersections and in other areas where the pavement may be subjected to <br />cross - traffic before it has cooled, spray the approaches with water to wet the tires of the <br />approaching vehicles before they cross the pavement. <br />337 -7.7 Transportation Requirements of Friction Course Mixtures: Cover all loads of <br />friction course mixtures with a tarpaulin. <br />March 2007 01000 -76 03- 4122.D <br />