My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1103
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2015 2:31:40 PM
Creation date
10/29/2007 11:00:34 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1103
Date (mm/dd/yyyy)
05/17/2007
Description
SR826 Project Bid Award & Agrmt w-Williams Paving (Bid# 07-03-02 $2,863,958.70)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br />I <br />11 <br />337 -8 Thickness of Friction Courses. <br />337 -8.1 FC -12.5 and FC -9.5: The thickness of the friction course layer will be the <br />plan thickness as shown in the Contract Documents. For construction purposes, the plan <br />thickness will be converted to spread rate as defined in 334-1.4. <br />Plan quantities are based on a Gmm of 2.540, corresponding to a spread rate <br />of 110 Ibs /yd2 -in [23.6 kg /m2 /10 mm]. Pay quantities will be based on the actual maximum <br />specific gravity of the mix being used. <br />337 -8.2 FC -5: The total thickness of the FC -5 layer will be the plan thickness as <br />shown in the Contract Documents. For construction purposes, the plan thickness will be <br />converted to spread rate based on the combined aggregate bulk specific gravity of the <br />asphalt mix being used as shown in the following equation: <br />Non -SI Units <br />Spread rate (Ibs /yd2) = t x Gsb x 40.5 <br />Where: t = Thickness (in.) (Plan thickness) <br />Gsb = Combined aggregate bulk specific gravity from the verified <br />mix design <br />SI Units <br />Spread rate (kg /M2) = t x Gsb x 0.83 <br />Where: t = Thickness (mm) (Plan thickness) <br />Gsb = Combined aggregate bulk specific gravity from the verified <br />mix design <br />The weight of the mixture shall be determined as provided in 320 -2.2. <br />Plan quantities are based on a Gsb of 2.635, corresponding to a spread rate <br />of 80 Ibs /yd2 [44 kg /M2]. Pay quantities will be based on the actual combined aggregate <br />bulk specific gravity (Gsb) of the mix being used. <br />337 -9 Special Equipment Requirements for FC -5. <br />337 -9.1 Fiber Supply System: Use a separate feed system to accurately proportion <br />the required quantity of mineral fibers into the mixture in such a manner that uniform <br />distribution is obtained. Interlock the proportioning device with the aggregate feed or weigh <br />system to maintain the correct proportions for all rates of production and batch sizes. <br />Control the proportion of fibers to within plus or minus 10% of the amount of fibers <br />required. Provide flow indicators or sensing devices for the fiber system, interlocked with <br />plant controls so that the mixture production will be interrupted if introduction of the fiber <br />fails. <br />When a batch plant is used, add the fiber to the aggregate in the weigh <br />hopper or as approved and directed by the Engineer. Increase the batch dry mixing time by <br />8 to 12 seconds, or as directed by the Engineer, from the time the aggregate is completely <br />emptied into the pugmill. Ensure that the fibers are uniformly distributed prior to the <br />addition of asphalt rubber into the pugmill. <br />When a drum -mix plant is used, add and uniformly disperse the fiber with the <br />aggregate prior to the addition of the asphalt rubber. Add the fiber in such a manner that it <br />will not become entrained in the exhaust system of the drier or plant. <br />337 -9.2 Hydrated Lime Supply System: For FC -5 mixes containing granite, use a <br />March 2007 01000 -77 03- 4122.D <br />
The URL can be used to link to this page
Your browser does not support the video tag.