Laserfiche WebLink
if <br />I <br />it <br />e <br />u <br />I <br />u <br />a <br />u. <br />0 <br />548 -7 Acceptance Program. <br />548 -7.1 General Requirements: Meet the requirements of 120 -10.1 except delete <br />the requirement of 120 - 10.1.4.1, 120 - 10.1.6 and 120 -10.2. <br />548 -7.2 Maximum Density Determination: Determine a minimum Quality Control <br />(QC) density of 100% of the maximum density in accordance with FM 1 T -180. <br />548 -7.3 Density Testing Requirements: Ensure compliance with the requirements of <br />nuclear density testing in accordance with FM 1 -T 238. Determine the in -place moisture <br />content for each density test. Use FM 1 -T 238, FM 5 -507 (Determination of Moisture <br />Content by Means of a Calcium Carbide Gas Pressure Moisture Tester), or FM 5 -535 <br />(Laboratory Determination of Moisture Content of Granular Soils By Use of a Microwave <br />Oven) for moisture determination. <br />Perform these tests at a minimum frequency of one set of tests per LOT. <br />One set of tests is defined as a density test for the fill within 3 ft [1 m] behind the wall <br />face and another density test for the fill beyond 3 feet [1 m] behind the wall face. <br />Determine test locations including stations and offsets, using the random <br />number generator provided by the Engineer. Do not use note pads or work sheets to record <br />data for later transfer to the density log book. Notify the Engineer upon successful <br />completion of QC testing on each LOT. <br />548 -7.4 Acceptance Criteria: Obtain a minimum density of 90% of the maximum <br />dry density as determined by FM 1 T- 180within 3 ft [1 m] behind the wall face and obtain <br />a minimum density of 95% of the maximum dry density as determined by FM 1 T -180 <br />from beyond 3 feet [ 1 m] behind the wall face. <br />548 -7.5 Frequency: Conduct sampling and testing at a minimum frequency listed in <br />the table below. The Engineer will perform Verification sampling and tests at a minimum <br />frequency listed in the table below. <br />Test Name <br />lQuality Control <br />Verification <br />Maximum Density <br />One per soil type <br />One per soil type <br />One set of tests per LOT pe <br />One set of tests per four LOTs for each <br />Density <br />Section. <br />I type of QC test. <br />548 -8 Certification. <br />Furnish a copy of all test reports which are necessary to document compliance with <br />the Specifications, at least ten days prior to wall construction. <br />Also furnish the Engineer a Certificate of Compliance certifying that the retaining <br />wall materials, backfill and construction practices comply with this Specification. <br />Acceptance of furnished material will be based on the Certificate of Compliance, <br />accompanying test reports, and visual inspection by the Engineer. <br />548 -9 Method of Measurement. <br />The quantity to be paid for will be the plan quantity, in square feet [square meters], <br />completed and accepted, of the area bounded by the top of the coping, the top of the <br />leveling pad, top of structural footings, bottom of walls which do not have footings or <br />leveling pads, and the beginning and end wall limits as shown on the wall control <br />drawings. <br />March 2007 01000 -127 03- 4122.D a <br />