My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1103
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2015 2:31:40 PM
Creation date
10/29/2007 11:00:34 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1103
Date (mm/dd/yyyy)
05/17/2007
Description
SR826 Project Bid Award & Agrmt w-Williams Paving (Bid# 07-03-02 $2,863,958.70)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N�lj <br />Submit the certified inspection report to the Engineer within seven calendar <br />days after performing the inspection. Any corrections to the inspection report must be <br />revised /corrected and resubmitted within three calendar days after notification by the <br />Engineer. Any deficiencies noted on the inspection report must be corrected within ten <br />days of notification from the Department. <br />Periodic, random verifications will be performed by the Department to ensure <br />the quality of the plants and correctness of the certified landscape inspection report. Any <br />unresolved disputes that arise between the QC reporting and the verifications performed by <br />the Department will be referred to the Statewide Disputes Review Board. <br />580 -4 Disposal of Surplus Materials and Debris. <br />Remove from the jobsite any surplus excavated material from plant holes unless <br />otherwise directed by the Engineer. Surplus is defined as material not needed after <br />installation of plants per Contract Documents. Upon commencement of the plant <br />installation, remove daily all landscape installation debris from the landscape locations <br />described in the Contract Documents. Remove all excess staking and guying materials from <br />the jobsite. <br />580 -5 Plant Establishment Period and Contractor's Warranty. <br />Take responsibility for the proper maintenance, survival and condition of all plants <br />for a period of one year after final acceptance in accordance with 5-11 . Notify the Engineer <br />upon completion of installation of all plants. <br />Mowing as part of the landscape work will be identified in the Contract Documents. <br />Continue any mowing of the landscape areas specified in the Contract Documents <br />throughout the establishment period. <br />Provide a Warranty /Maintenance Bond to the Department in the amount of the total <br />sums bid for all landscape items as evidence of warranty during this plant establishment <br />period. The cost of the bond will not be paid separately, but will be included in the costs of <br />other bid items. <br />In addition to satisfying the provisions of Section 287.0935, Florida Statutes, the <br />bonding company is required to have an A.M. Best rating of "A" or better. If the bonding <br />company drops below the "A" rating during the Warranty /Maintenance Bond period, <br />provide a new Warranty /Maintenance Bond for the balance of the establishment period <br />from a bonding company with an "A" or better rating. In such event, all costs of the <br />premium for the new Warranty /Maintenance Bond will be at the Contractor's expense. <br />The Engineer may conduct interim inspections of all landscape items during the <br />plant establishment period, as well as at the end of the plant establishment period. As part <br />of the warranty to the Department, and at no cost to the Department, replace all plants <br />found not to meet minimum specifications as shown in 580 -2.1 .1 and 580 -3.5 within ten <br />days after each inspection. <br />Prior to the end of the establishment period, remove all staking and guying from the <br />project. <br />At the end of the establishment period, the Engineer will release the Contractor <br />from further warranty work and responsibility provided all plants are established and all <br />previous warranty and remedial work, if any, has been completed to the satisfaction of the <br />Engineer. <br />I <br />March 2007 01000 -144 03- 4122.D <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.