My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1181
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1181
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:42:21 AM
Creation date
11/20/2007 4:23:34 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1181
Date (mm/dd/yyyy)
11/15/2007
Description
181 Drive Active Park Additional Svcs Agrmt w-Miller Legg
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Project No: 01-14122 <br /> <br />Provisions for Reimbursable expenses associated with this Additional <br />Service request are to be provided in accordance with the current master <br />agreement with the City. <br /> <br />3.0 SCOPE OF ADDITIONAL SERVICES AND FEE <br /> <br />The scope for this additional service agreement to be provided by Consultant is as <br />follows: <br /> <br />Task 1. Site/Engineering Construction Observation Services - Consultant shall <br />continue providing Construction Observation Services in accordance with the <br />original agreement: <br /> <br />a. Provide general observation of the site work on a weekly basis. <br />b. Attend weekly construction progress meetings (Engineering and <br />Landscape Architecture representation). <br />c. Attend project walk-throughs at the request of the City Manager. <br />d. Review contractor pay requests and change orders. <br />e. Review shop drawings of specified items per plans. <br />f. Response to Contractor's RFl's. <br />g. Response to Contractor's substitution requests. <br /> <br />The fee for this task shall cover all labor costs through the final walk-through <br />of the project (or February 28th, 2008). <br /> <br />The fee for this miscellaneous services task will be on an hourly basis and is <br />not to exceed $29,000.00 without written authorization by the Client. <br /> <br />FEE: Hourly per the attached Rate Schedule <br /> <br />Task 2. Architectural Construction Observation Services - Consultant shall <br />continue providing Construction Observation Services for the buildings in <br />accordance with the original agreement: <br /> <br />a. Provide general observation of the building-related construction. <br />b. Attend weekly construction progress meetings. <br />c. Attend project walk-throughs at the request of the City Manager. <br />d. Review Contractor pay requests and change orders relating to the <br />architectural elements. <br />e. Review shop drawings of architecturally specified items per plans. <br />f. Response to Contractor's RFl's relating to the buildings. <br />g. Review services will include MEP and structural sub-consultants. <br />h. Response to Contractor's substitution requests. <br /> <br />Page 2 of 3 <br /> <br />Initial: ML: <br /> <br />Client: <br />
The URL can be used to link to this page
Your browser does not support the video tag.