Laserfiche WebLink
<br />Project No: 01-14122 <br /> <br />I. Attendance by representative or structural sub-consultants may be <br />necessary at a walk-through and/or construction progress meeting (allow <br />for twice a month). <br /> <br />The fee for this task shall cover all labor costs through the final walk-through <br />of the project (or February 28th, 2008). <br /> <br />The fee for this miscellaneous services task will be on an hourly basis and is <br />not to exceed $29,000.00 without written authorization by the Client. <br /> <br />FEE: Hourly per the attached Rate Schedule <br /> <br /> Lump Sum Hourly <br />Task Description Fee NTE <br />Task 1 Site/Engineering Construction $0.00 $29,000.00 <br /> Observation <br />Task 2 Architectural Construction Observation $0.00 $29,000.00 <br /> TOTAL $0.00 $58,000.00 <br /> <br />ASA #9 FEE SUMMARY <br /> <br />V:\Twp-Rng-Sec\52-42-11 \114122\DOCS\Contracts\AS-Agree\ASA No.9- Construction Observation extension (Scope) 11-0S-07.doc <br /> <br />Page 3 of 3 <br /> <br />Initial: ML: <br /> <br />Client: <br />