My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1198
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1198
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2016 11:30:17 AM
Creation date
2/28/2008 2:51:41 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1198
Date (mm/dd/yyyy)
01/17/2008
Description
Marlin - Newport Pier Engineering Services Agrmt ($441,303.00)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />January 9, 2008 <br /> <br />~~!!~I~.l.IJI <br />~, <br /> <br />Mr. A. John Szerlag <br />City Manager <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br /> <br />RE: PROPOSAL FOR PROFESSIONAL SERVICES <br />NEWPORT FISHING PIER REPLACEMENT <br /> <br />Dear Mr. Szerlag, <br />Marlin Engineering, Inc. is please to respond to your request for proposal for the referenced project. <br /> <br />1. PROJECT <br /> <br />Provide Consulting Civil Engineering Services for the plans design, including Engineering <br />Specification and permitting documents for the demolition and reconstruction of the Newport <br />Fishing Pier. The Newport Fishing Pier is located at Sunny Isles Boulevard and Collins <br />Avenue, and is accessible through Pier Park. The Newport Fishing Pier was built in 1936, and <br />was designated as a historic site in 1982 <br /> <br />2. SCOPE OF WORK <br /> <br />Project Description <br /> <br />Consultant shall provide final plans for the replacement of the Newport Fishing Pier from the <br />existing restaurant structure to end of the fishing pier. The existing fishing pier structure is <br />approximately 635 feet long and 16 feet wide with timber piles, steel girders, steel floor beams <br />and timber floor. <br /> <br />1. Pier Design and Plans, <br />2. Newport Fishing Pier Restaurant Design <br />3. Surveying, <br />4. Geotechnical Services, <br />5. Hydraulic Analysis, <br />6. Architectural Services, <br />7. Permitting and Environmental Assessment, <br />8. Special Engineering Specification Package <br />9. Mechanical, Lighting & Plumbing Services, <br />10. MEI will provide Twenty (20) sets of plans for dry-run and final process. <br />11. MEI will provide the following services during the Construction Phase of the project: <br />a. Pre-construction Conference. <br /> <br />Transpor.tation P,ar.lr.ling'll:Traffic EngineeringG.!iPject: Deve'~gh\Nay Design <br />M unic rpa'trAvi at~TransitaConstruct:i on Manage me nt'rilBri dge , nspecti~surveyi ng <br /> <br />2191 NW 97 Avenue Miami. Florida 33172-2313 Tel. /3051 477-7575 Fax /3051477-7590 <br /> <br />www.marlinengineering.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.