My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1198
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1198
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2016 11:30:17 AM
Creation date
2/28/2008 2:51:41 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1198
Date (mm/dd/yyyy)
01/17/2008
Description
Marlin - Newport Pier Engineering Services Agrmt ($441,303.00)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />b. Shop drawings and technical submittal review. <br />Requests for information (RFI) and plan clarification, as well as technical <br />interpretations of the construction plans when requested by Client. <br />c. Three (3) Site Visits during the construction of the project. <br /> <br />3. COMPENSATION FOR PROFESSIONAL SERVICES <br /> <br />For the seNices performed under paragraph 2 Scope of Work, the Client will pay the Engineer <br />the unit hourly rate not to exceed the sum of Four Hundred Forty One Thousands Three <br />Hundred Three Dollars ($441,303.00), as described below and payable monthly in proportion <br />to the seNices performed. <br /> <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />9. <br /> <br />Pier Design and Plans <br />Architectural/Structural Design - Restaurant <br />SUNeying <br />Geotechnical SeNices <br />Hydraulic Analysis <br />Architectural SeNices <br />Permitting and Environmental Assessment <br />Mechanical, Lighting & Plumbing Design SeNices <br />Post-Design SeNices <br /> <br />$142,620.00 <br />$48,000.00 <br />$10,000.00 <br />$55,585.00 <br />$40,398.00 <br />$16,500.00 <br />$90,000.00 <br />$13,200.00 <br />$25,000.00 <br /> <br />$441,303.00 <br />4. ANTICIPATED DESIGN AND CONSTRUCTION DURATION <br /> <br />TOTAL DESIGN AND POST-DESIGN FEE <br /> <br />1. Design and Permitting <br />2. Demolition and Construction <br /> <br />6 months <br />12 months <br /> <br />5. NOT INCLUDED <br /> <br />A- Bid Phase Services - Optional Services <br /> <br />. Document Review and meetings or discussions with the parties involved in this <br />process. <br /> <br />B- PHYSCAL DEMOLITION AND DISPOSAL OF THE EXISTING FISHING PIER <br />(this activity to be included at construction phase) <br /> <br />C- ENGINEER CONSTRUCTION OF NEW FISHING PIER <br /> <br />Should the Client wish us to provide and/or negotiate with third parties, any of the <br />aforementioned seNices or any other additional work not included in this proposal under the <br /> <br />Transpor~tion P'anninggT~ffic Engineeri~oject Deve'oprne~~~~.c>esign <br />M unicipa'gAviati0nD.Transitr;;JLConstructi on Manage rne~ge , ns~yi ng <br /> <br />2191 NW 97 Avenue Miami. Florida 33172-2313 Tel. 13051 477-7575 Fax 13051477-7590 <br /> <br />.... <br /> <br />www.marlinengineering.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.