My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1199
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1199
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:42:30 AM
Creation date
2/28/2008 2:52:12 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1199
Date (mm/dd/yyyy)
01/17/2008
Description
Marlin - 2nd Addendum to Sunny Isles Blvd Project/SR826 Agrmt ($47,720.00)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />...,-. <br /> <br /> <br />January 6, 2008 <br /> <br />Rick Conner, P.E. <br />Engineering & Public Works Director <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, Fl 33160 <br /> <br />Re: Proposal for Professional Engineering Services for <br />Post Design for SR 826 EB/Sunny Isles Blvd Sidewalk Enhancement Project <br />From Bridge to SR AlA/Collins Avenue <br />Sidewalk Reconstruction and Supplemental Drainage Design <br />Project No. 03-4122.D <br /> <br />Dear Mr. Conner: <br /> <br />We are pleased to provide this proposal for providing post design services for the subject construction <br />project as requested by the City. Enclosed is the Scope of Services and Fee Estimate for Marlin <br />Engineering, Inc. for the design of the reconstruction sidewalk and the installation of supplemental drainage <br />system in the form of slotted drain at the northern right of way limit (north back of sidewalk) <br /> <br />Below is an outline of scope, contract duration, subconsultants, and total fee proposal for this contract. <br /> <br />1. PURPOSE <br /> <br />Marlin Engineering Inc. will provide Post Design Services during construction for the State Road 826 <br />Eastbound/Sunny Isles Boulevard Improvement Sidewalk Enhancement Project, Project No. 03-4122.D in <br />the City of Sunny Isles Beach, Miami-Dade County, Florida as outlined below. <br /> <br />2. SCOPE OF SERVICES <br /> <br />· Perform the design and contract plans preparation for the sidewalk reconstruction with <br />adverse slope to collect storm runoff at back of sidewalk, <br />· Design of a drainage storm collection system (slotted drain system) and prepare contract <br />plans for construction. <br /> <br />For a detail of the staff hours for each task and activity, see the attached staff hour and fee estimate. <br /> <br />IX <br />I <br />r <br /> <br />3. <br /> <br />CONTRACT DURATION <br /> <br />The anticipated contract duration for these services and the basis for the attached fee estimate are 120 days. <br /> <br />4. FEE PROPOSAL <br /> <br />The total fee for the post design services is a unit hourly rate not to exceed the amount of Seventeen <br />Thousands Four Hundred Fifty dollars, $17,450.00. This fee will be invoiced on a monthly basis. Additional <br /> <br />Transportation Planning" Traffic Engineering Project Development'~ High\Nay Design <br />Municipal' Aviation .. Transit. Construction Management Bridge Inspection _ Surveying <br /> <br />2191 NW 97 Avenue Miami. Florida 33172-2313 Tel. 1305) 477-7575 Fax 1305) 477-7590 <br /> <br />ire <br /> <br />www.marli. <br /> <br />-"" <br /> <br />ATTACHMENT "A" <br />
The URL can be used to link to this page
Your browser does not support the video tag.