Laserfiche WebLink
<br />Work Authorization No. 99 <br /> <br />August 8, 2008 <br /> <br />Calvin, Giordano & Associates, Inc. Proposal No. 03-4 I 97. I <br /> <br />G. The drawings required to address the items noted above shall be issued to <br />the contractor as a change order. <br /> <br />II. Professional Construction Services <br /> <br />A. Additional Inspection and contract administration to coordinate landscape <br />area with the Epicure Site and the FPL Undergrounding conduits <br />installation <br /> <br />B. This is based on a 6 weeks construction time. <br /> <br />2. BASIS OF COMPENSATION <br /> <br />Hourly rates with an estimated fee of$15,01O.00 plus reimbursables at $750.50 <br />with a total not to exceed amount of$I5,760.50. Payments to be made monthly. <br /> <br />3. TIME OF PERFORMANCE <br /> <br />Item I through under the scope of services will be completed within 0 calendar <br />days after the Notice to Proceed except for delays beyond the control of the <br />Consultant. <br /> <br />4. SUBMITTED <br /> <br />LU ~ <br /> <br />CAL VIN, GIORDANO & ASSOCIATES, INC. <br /> <br />Submitted by: <br /> <br />Date: <br /> <br />~/;J/O/ <br />I I <br /> <br />5. APPROVAL / <br />Appmved by, \-h< \1l'^--C.. J. W0-- <br />-..e--! \ 1 <br />"'-.TOM Szerlag, City Manager <br />\ "-----' . <br /> <br />Date: <br /> <br />i I <br />q-I (0 I 0-8 <br />I r <br />