Laserfiche WebLink
<br />--- <br /> <br />... <br /> <br />SECTION 5 <br />PROJECT DESCRIPTION AND REQUIREMENTS <br /> <br />EMERGENCY DEBRIS CLEARING AND REMOVAL OPERATlONS <br /> <br />5.1. PlJIIOSE <br /> <br />This document constitutes a Request for Proposal (RFP) from experienced finns to dear and remove and lawfully <br />dispose of disaster-generated debris (other than hazardous materiaJs and household putrescible garbage) from public <br />property and public rights-of-way in the City of Sunny Isles Beach, Florida, immediately after a natural or man-made <br />disaster. The objective of the RFP and subsequent contracting adivity is to secure the seM:es of an experienced Contractor <br />who is capable of efOCiently dearing and removing very large volumes of dsaster-generated debris from a large area in a <br />timely and cost-effective manner and lawfully cisposilg of at collected debris. The Contractor must be capable of <br />assembling, directing and managing a workforce that can complete the debris management operations in a maximum <br />of 30 days. The contract will be tor a term of three (3) years with two (2) options to renew this Agreement tor one (1) <br />year each, with annual re~rtification of the Contractor's capabilities tor yeatS two (2) through five (5). <br /> <br />While intended to cover debris management needs in any major disaster scenario, the primary focus is on the threat of <br />hurricane or tomado damage to the City. The planning standards used for this project are based on the anticipated <br />impacts of a Category 4 Hurricane. <br /> <br />5.2. BACKGROUND <br /> <br />5. 2.1. Introduction <br /> <br />The City of Sunny Isles Beach staff has developed a Debris Management Plan that describes the general <br />needs and approaches for clearing, removing and disposing of large volumes of debris after a major disaster. It <br />provides general infonnation on debris classifications, IodiI hauling and disposal capabilities and capacities. <br />The plan provides general guidance tor the Contractor and is available upon request. <br /> <br />The City of Sunny Isles Beach's disaster recovery planning includes considerations tor dearing, removing and <br />disposing of the voi.mes and types ci debris expected to be generated by a major disaster sud1 as a hurOCane (X <br />tomado. The planning approach is formulated in part on the concept of strategic pre-positioning of plans and <br />resources necessary for timely, coordinated response and recovery operations, includng dearing and removal of <br />debris from public J>rq)erty and pubic rigrts-of-way throtqlout the City using Contractor work torces. <br /> <br />The City envisions the need for a single major Contractor to carry out the Debris Clearing and Removal work <br />throughout the City. The Contractor must have the capacity to manage a major workforce with m~ <br />Subcontractors and to cover the expenses associated with a major recovery operation prior to initial City payment <br />and between subsequent payments, as well as the capcr::ity to provide the necessary bonds and insurance. The <br />Contractor must also have an established management team, an established network of resources to provide the <br />necessary equipment and personnel. comprehensive debris dearing, removal and volume reductioo operations <br />plans, and demonstrable experience in major disaster recovery projects. <br /> <br />The contract to be awarded will be a pre-positioned contract that wi. be activated only in the face of an actual <br />cJsaster (X emergency. As such, no ~ wiI occrue to the Contractor unless and until the contract is <br />activated either in anticipation of a natural or man-made disaster or immediately after such disaster. <br /> <br />Potential Contractors are solely responsible for their own costs ot developing the proposals associated with <br />this RFP. In addition, a Contractor who receives a pre-positioned contract for the work will be required to <br />participate in certain City-directed disaster recovery training and/or exercises, one (1) to two (2) days each year, <br />at no cost to the City. The pre-positioned contract will be tor term of three (3) years with two (2) one (1) year <br /> <br />.to TT .to rUl\/nj'NT " A " <br /> <br />SIB <br />