My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2009-1434
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2009
>
Reso 2009-1434
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2015 10:41:07 AM
Creation date
7/8/2009 4:36:30 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2009-1434
Date (mm/dd/yyyy)
06/18/2009
Description
RFQ No. 09-03-01Construction Services for the Heritage Park and Parking GarageCoastal Construction Company
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor means the Successful Contractor selected by the City to provide all labor, <br />materials, equipment, and services to complete the Work described in the Contract <br />Documents. <br />Contractor Project Manager means the person designated by Contractor as its lead <br />representative to the City. The Contractor Project Manager shall have the authority to <br />obligate and bind the Contractor and to act on all matters on behalf of Contractor except <br />for revisions to the Contract Documents and Change Orders. <br />Construction Change Directive means a written directive to effect changes to the <br />Work, prepared by and executed by the City. <br /> <br />Construction Schedule means a critical path schedule or other construction <br />schedule, as defined and required by this Agreement. <br />Construction Work means all Work required by this Agreement for the construction of <br />the Project. The Construction Work s also referred to herein as the "Work". <br /> <br />Cure means the action taken by the Contractor, promptly after receipt of written notice <br />from the City of a breach of the Agreement, which shall be performed at no cost to the <br />City, to repair, replace, correct, and/or remedy all material, equipment, or other <br />elements of the Work or the Agreement affected by such breach, or to otherwise make <br />good and eliminate such breach, including, without limitation, repairing, replacing or <br />correcting any portion of the Work or the Project site disturbed in performing such cure. <br /> <br />Cure Period means a period of thirty (30) days, after receipt of written notice to cure <br />from the City, in which the Contractor is required to cure deficiencies in the Work or <br />compliance with this Agreement or the Contract Documents. <br /> <br />Drawings means the graphic and pictorial portions of the Work, which serve to show <br />the design, location and dimensions of the Work to be performed, including, without <br />limitation, all notes, schedules and legends on such Drawings. <br /> <br />Field Directive means a written approval for the Contractor to proceed with Work <br />requested by the City, which is minor in nature and should not involve additional cost. <br /> <br />Final Completion means the date subsequent to the date of Substantial Completion at <br />which time the Contractor has completed all the Work in accordance with the <br />Agreement as certified by the City and submitted all documentation required by the <br />Agreement. Final Completion shall be evidenced by the City's issuance of a Final <br />Certificate for Payment. <br />Insurance Requirements means the requirements described in this Agreement and the <br /> <br />Contract Documents. <br /> <br />Notice To Proceed means a written letter or directive issued by the City directing that <br />the Contractor may begin Work on the Project or a specific task of the Project. <br />Project Manager means an employee or representative of the City assigned to manage <br />and monitor the Work to be performed under this Agreement and the construction of the <br />Project. <br />Project means the construction and incidentals thereto, of the project entitled RFQ <br />09-03-01 Professional Construction Services for the Parking Garage driveway connection <br />from 193rd Street, and associated landscape and irrigation work, as described in the <br />Contract Documents. <br />Project Site means the area for the Heritage Park and Parking Garage, more fully <br />described as the four (4) acre facility bounded by Collins A venue on the east, Lehman <br /> <br />I" <br />
The URL can be used to link to this page
Your browser does not support the video tag.