Laserfiche WebLink
<br />Causeway on the south, Gallahad-Dade Road (193rd) on the north, and the Ocean View <br /> <br />residential development on the west. <br /> <br />Punch List means a compilation of items of Construction Work required to be performed by, <br />or through the Contractor after the Substantial Completion inspection and prior to Final <br />Completion and payment. <br />Request For Information (RFI) means a request from the Contractor seeking an <br />interpretation or clarification by the City relative to the Agreement and/or the Contract <br />Documents. The RFI, which shall be clearly marked RFI, shall clearly and concisely set <br />forth the issue(s) or item(s) requiring clarification or interpretation and why the response <br />is needed. The RFI must set forth the Contractor's interpretation or understanding of the <br />document(s) in question, along with the reason for such understanding. <br /> <br />Schedule of Values means a written schedule setting forth the detailed and itemized cost <br />breakdown, inclusive of labor, material, and taxes of all elements comprising the Work. <br /> <br />Specifications and Plans as used herein means that portion of the Contract <br />Documents which are the written requirements for the materials, equipment, systems, <br />standards and workmanship for completion of the Work and performance of related <br />services, as prepared by Spill is-Candela DMJM for this Project. <br /> <br />Sub-Contractor(s) means a person or entity other than a materialman or laborer that <br />has a direct contract with the Contractor to perform or supply any portion of the Work. <br /> <br />Substantial Completion means that point at which the Work is at a level of completion <br />in substantial compliance with the Agreement such that the City can use, occupy and/or <br />operate the facility in all respects to its intended purpose. Substantial Completion shall be <br />evidenced by the City's execution of a Certificate of Substantial Completion. <br />Time for Completion means the date of Substantial Completion as specified in the <br />Contract Documents. <br /> <br />Work as used herein refers to all services required by the Contract Documents, <br />including all labor, materials, equipment, supervision and services needed to complete <br />the Project in accordance with the Contract Documents. <br /> <br />ARTICLE 1. SCOPE OF WORK <br /> <br />Contractor shall provide all labor, materials, equipment, tools, manpower, <br />management, supervision, and all other necessary goods and services to perform the <br />Work in the manner provided this Agreement and the Contract Documents. <br /> <br />ARTICLE 2. CONTRACT TIl\1E. TIl\1E FOR COMPLETION AND <br />LIQUIDATED DAMAGES <br /> <br />2.1 Time is of the essence in the performance of the Work under this Agreement. The <br />Commencement Date shall be no later than five (5) days after City's issuance of the <br />Notice to Proceed. Contractor shall perform the Work in accordance with the <br />Construction Schedule and shall achieve Substantial Completion of construction not later <br />than the Time for Completion. <br />