My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1301
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2016 11:21:17 AM
Creation date
10/7/2008 10:10:18 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1301
Date (mm/dd/yyyy)
07/17/2008
Description
Tenex Bid & Agrmt for Atlantic Isles Roadway & Utility Improv ($2,885,048.00)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Suppliers as appropriate to the agenda. <br />4. Others as appropriate. <br />E. Suggested Agenda: <br />1. Review, approval of minutes of previous meeting. <br />2. Review of work progress since previous meeting. <br />3. Field observations, problems, conflicts. <br />4. Problems which impede Construction Schedule. <br />5. Review of off site fabrication, delivery schedule. <br />6. Corrective measures and procedures to regain projected schedule. <br />7. Revisions to Construction Schedule. <br />8. Progress, schedule, during succeeding work period. <br />9. Coordination of schedules. <br />10. Review submittal schedules; expedite as required. <br />11. Maintenance of quality standards. <br />12. Pending changes and substitutions. <br />13. Review proposed changes for: <br />a. Effect on Construction Schedule and on a completion date. <br />b. Effect on other contracts of the Project. <br />14. Other business. <br />15. Construction schedule. <br />16. Critical /long lead items. <br />F. The Contractor is to attend progress meetings and is to study previous meeting <br />minutes and current agenda items, in order to be prepared to discuss pertinent <br />topics such as deliveries of materials and equipment, progress of work, etc. <br />G. The Contractor is to provide a current submittal log at each progress meeting in <br />accordance with Section 01340. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br />END OF DOCUMENT <br />05108 01200 -3 05 -4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.