My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2008-1301
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2008
>
Reso 2008-1301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2016 11:21:17 AM
Creation date
10/7/2008 10:10:18 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2008-1301
Date (mm/dd/yyyy)
07/17/2008
Description
Tenex Bid & Agrmt for Atlantic Isles Roadway & Utility Improv ($2,885,048.00)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01310 <br />CONSTRUCTION SCHEDULES <br />PART 1 - GENERAL <br />1.01 REQUIREMENTS INCLUDED <br />A. Promptly after Award of the Contract and within ten days after the effective date <br />of the Agreement, prepare and submit to the Engineer estimated construction <br />progress schedules for the work, with sub - schedules of related activities which <br />are essential to its progress. <br />B. Submit revised progress schedules on a monthly basis. <br />C. No partial payments shall be approved by the Engineer until there is an approved <br />up to date construction progress schedule on hand. <br />D. The Contractor shall designate an authorized representative of his firm who shall <br />be responsible for development and maintenance of the schedule and of <br />progress and payment reports. This representative of the Contractor shall have <br />direct project control and complete authority to act on behalf of the Contractor's <br />schedule. <br />1.02 RELATED REQUIREMENTS <br />A. Section 01010: Summary of Work. <br />B. Section 01152: Applications for Payment <br />C. Section 01200: Project Meetings. <br />D. Section 01340: Shop Drawings, Working Drawings and Samples. <br />1.03 FORM OF SCHEDULES <br />A. Prepare schedules for submittal each month with pay request. The form of the <br />schedule is to be MicrosoftTM Project 4.1 a or approved equal. The Schedule is to <br />indicate work completed to date and additions to or deletions from the schedule. <br />1. Provide separate horizontal bar or CPM for each trade or operation within <br />each structure or item. <br />2. Horizontal time scale: In weeks from start of construction and identify the <br />first work day of each month. <br />3. Scale and spacing: To allow space for notations and future revisions. <br />4. Minimum sheet size: 24 inches x 36 inches. <br />05/08 01310 -1 05 -4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.