My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Florida Equipment Rentals
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-10-02) Central Island Drainage
>
Responses
>
Central Florida Equipment Rentals
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:44 PM
Creation date
8/7/2008 2:48:55 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Central Island Drainage and Street Improvements
Bid No. (xx-xx-xx)
07-10-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />... <br /> <br />~ <br /> <br />Ii <br />iil <br />.. <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br /> <br />Ii <br />-' <br /> <br />~ <br /> <br />DOCUMENT 00403 <br /> <br />TRENCH SAFETY ACT <br /> <br />(90-96, Laws of Florida) <br /> <br />Bidder acknowledges that included m the appropriate bid items of the proposal and in the Total BId Price <br />are costs for complying with the Florida Trench Safety Act (90-96, Laws of Florida) effective October 1, <br />1990. The bidder further identifies the costs of such compliance to be summarized below: <br /> <br />iii If applicable, the Contractor certifies that all trench excavation done within his control in excess of five <br />-' <br />feet in depth shall be in accordance with the Florida Department of Transportation's Special Provisions <br />~ Article 125-1 and Sub-article 125-4.1 (TRENCH EXCAVATIO~ SAFETY SYSTEM AND <br />SHORING, SPECIAL - TRENCH EXCA V A nON). <br /> <br />~ <br /> <br />.. <br />..... <br /> <br />~ <br /> <br />iii <br />.. <br /> <br />iii <br />... <br /> <br />iii <br />-oJ <br /> <br />~ <br /> <br />III <br />... <br /> <br />~ <br />~ <br /> <br />II <br />.. <br /> <br />II <br />~ <br /> <br />II <br />.. <br /> <br />~ <br /> <br />~ <br /> <br />Failure to complete the above may result m the bid being declared non-responsive. <br /> <br />Contractor agrees that the above safety compliances and costs are included in his bid package. <br /> <br />Signatu~o~ <br /> <br /> <br />Robert Baer, V.P. <br /> <br />END OF DOCUMENT <br /> <br />Oct. 2007 <br /> <br />00403-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.