My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Florida Equipment Rentals
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-10-02) Central Island Drainage
>
Responses
>
Central Florida Equipment Rentals
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:44 PM
Creation date
8/7/2008 2:48:55 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Central Island Drainage and Street Improvements
Bid No. (xx-xx-xx)
07-10-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~. <br /> <br />~ <br /> <br />ij <br /> <br />~ <br />III <br /> <br />~ <br />~ <br /> <br />~ <br /> <br />s <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br /> <br />.- <br />...J <br /> <br />.. <br />...J <br /> <br />.. <br />.. <br /> <br />~ <br /> <br />iii <br />...J <br /> <br />II <br />.. <br /> <br />~ <br /> <br />" <br />..,j <br /> <br />III <br />..,j <br /> <br />~ <br /> <br />III <br />... <br /> <br />III <br />.. <br /> <br />~ <br />~ <br /> <br />~ <br /> <br />DOCUl\IENT 00420 <br /> <br />IJ\Tf0 R1\;lA TION REQUIRED FROivl BiDDERS <br /> <br />GENERAL 11'-J't 0 R.J\1 A TION <br /> <br />The Bidder shall fumish the following information. Failure to comply with this reqUlrement may cause its <br />rejection. Additional sheets shall be attached as required. <br /> <br />1. <br /> <br />Contractor's Name and Address: C.pntr;]l Florin;] Equipment Rpnt;]ls, Tnc. <br />9030 NW 97th Terrace Medley. Florida 33178 <br /> <br />2. <br /> <br />Contractor's Telephone and Fax Numbers: 105-888-3344 <br /> <br />/ Fax: 305-888-9305 <br /> <br />3. <br /> <br />Contractor's License: E-10R <br />Primary Classification: 0001 - General Engineering <br /> <br />4. <br /> <br />Number of years as a Contractor in construction work of the type invol ved in this Contract: <br />] 7 <br /> <br />5. <br /> <br />List the names and titles of all officers of Contractor's firm: <br /> <br />James Baer, President <br /> <br />Robert Baer. Vice President <br /> <br />Richard Baer, Vice President <br /> <br />Carol C. Baer. Secretary / Treasurer <br /> <br />6. <br /> <br />Name of person who inspected site or proposed work for your firm: <br /> <br />Name: Robert Baer / Martin Holman III <br /> <br />Date oflnspection: I \ J (;1/ ~ ( <br />, <br /> <br />7. <br /> <br />'What is the last project of this nature you have completed') <br /> <br />SR-5 Biscayne Blvd. Improvements from 37th Street to 67th Street <br /> <br />8. <br /> <br />Have you ever failed to complete work awarded to you; if so, where and why? NO <br /> <br />9. Name three individuals or cOI1)orations for which you have performed work and to which you refer: <br /> <br />1- Robert & Albert Lopez Gener;Jl Asphalt Comp~ny Inc. <br />2 - Ha~k C~rroll - HD Supply (formerly Hughes Supply) <br />3 - LU1S Vldal - US Precast Corporation <br /> <br />Oct. 2007 <br /> <br />00420-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.