My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-10-02) Central Island Drainage
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:47 PM
Creation date
8/14/2008 11:37:27 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Central Island Drainage and Street Improvements
Bid No. (xx-xx-xx)
07-10-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />l8.5 The award of the contract, if it is awarded, will be to the lowest responsible total base bidder <br />whose qualifications indicate the award will be to the best interest of the Owner and whose <br />proposal shall comply with the requirements of the Contract Documents. Time is of the essence <br />for this project and the time limits set in the proposal, if set by the bidder, will be accorded <br />weight by the Owner in the determination of the best proposal. In no case will the award be <br />made until all necessary investigations have been made into the responsibility of the low bidder <br />and the Owner is satisfied that the bidder is qualified to do the Work and have the necessary <br />organization, capital and equipment to carry out the provisions of the contract to the satisfaction <br />of the Owner within the time specified. <br /> <br />18.7 If the Contractor feels that a problem exists either prior to, or during the bid opening, he/she <br />shall contact the City (within 24 hours of the bid opening) and follow the City's current policy <br />for bid protests. <br /> <br />l8.8 The Owner reserves the right to award as a total contract any combination of the Unit Price Bid <br />Schedule Items that would be in the best interest of the Owner. <br /> <br />19. CASH ALLOWANCES <br /> <br />19.1 The Bidder is advised that a space is provided in the Bid Form, Document 00300, for this <br />purpose only. The Contractor shall not proceed on any additional work to be covered by <br />allowances until authorized in writing by the Engineer. Such work shall be approved by the <br />Owner, shall be within the scope of work defined by this Contract and shall not exceed the <br />amount indicated in the Bid Form. Any amount remaining in the Cash Allowance will be <br />retained by the Owner. <br /> <br />END OF DOCUMENT <br /> <br />Oct. 2007 <br /> <br />00100-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.