Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />I. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />SECTION 00300 <br /> <br />BID FORM <br /> <br />Bid of (Name of Bidder) <br /> <br />Address <br /> <br />Phone <br /> <br />Fax: <br /> <br />To furnish all materials, equipment and labor and to perform all work in accordance with the Contract <br />Documents for construction of: CENTRAL ISLAND DRAINAGE AND STREETS IMPROVEMENTS <br />located in the CITY OF SUNNY ISLES BEAG-I. <br /> <br />To: CITY OF SU1ThTY ISLES BEACH <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br /> <br />The undersigned Bidder has carefully examined the Bidding Documents and the site of the proposed work <br />and is familiar with the nature and extent of the work and any local conditions that may in any manner <br />affect the work to be done. <br /> <br />The undersigned Bidder agrees to do all the work and furnish all materials called for by the Bidding <br />Documents, in the manner prescribed therein and to the standards of quality and performance established <br />by the Engineer for the unit price amounts stated in the spaces herein provided, for each of the items or <br />combination of items stipulated. Unit price line items shall include cost of implementing all applicable <br />safety requirements. Bidder acknowledges that estimated quantities scheduled are approxirnated for the <br />sole purpose of obtaining comparative bids for determination of the lowest responsible bidder and actual <br />quantities required may increase or decrease. Bidder further agrees that payments will be made on the <br />basis of actual quantities placed and accepted in the construction <br /> <br /> UNIT BID PRICE SCHEDULE <br />Item No. Description Estimated Unit Unit Price Amount <br /> Quantitv <br /> US$ US$ <br />101-1 Mobilization 1.0 LS <br />102-1 Maintenance of Traffic 365 LS/Da <br />102-3 Commercial material for Drivewav 500 CY <br />102-14 Traffic Control Officer 200 MH <br />102-61 Proiect Sian, (see Soecial Provisions) 3 Ea <br />102-71-11 Barrier Wall (temoorarv) 100 LF <br />102-71-21 Barrier Wall (relocation) 300 LF <br />104-13-1 Staked Silt Fence 500 LF <br />109-71-1 Field Office (300 SF Min.) 365 Da <br />11 0-1 -1 Clearina and Grubbina 14 LS/Ac <br />120-1 Reaular Excavation 1,149 CY <br />230-2 Limerock Material (12" Thick) 1,233 CY <br />327-70-1 Millina of existina Pavement (1" Avq.) 23.787 SY <br />331-2-1A Tvoe S-1 Asohaltic Concrete (3' Avq. ) 3,611 Ton <br />425-1-331 Curb Inlet Tvoe P-3 (<10') 1 I Ea <br /> <br />Oct. 2007 <br /> <br />00300-1 <br />