My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Misc./Addenda
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-10-02) Central Island Drainage
>
Misc./Addenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 10:06:06 AM
Creation date
8/14/2008 12:05:26 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Central Island Drainage and Street Improvements
Bid No. (xx-xx-xx)
07-10-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />iH <br /> <br />5. What are the fees for Sunny Isles Beach Police Officers? If SIB Police is not available, can <br />we use State Troopers? <br />The Contractor must use Sunny Isles Police officers, unless otherwise approved by the <br />City of Sunny Isles Police Department (Sandra Block is the contact person and may be <br />reached at 305.792.1839). <br /> <br />If no City Officers are available, others may be approved by the City. Fees al'e $40.00 <br />per Officer/Hour for regular days and $60.00 per Officer/Hour during holidays. <br /> <br />6. Are there any requirements for notification to homeowners? <br />Yes. Contractor must notice homeowners and must hold public awareness meetings. <br /> <br />7. Will the City pay for testing of density and concrete? <br />Refer to DIVISION I, GENERAL SPECIFICATIONS, Section 7, Payment of Test by <br />City, <br /> <br />8. Will the City pay for stored materials? <br />NO. <br /> <br />9. What is the current condition of the existing drainage pipes to be desilted? What percentage <br />of the pipe is filled with dirt? <br />Pipes to be desilted have been identified on plans attached to this Addendum. <br /> <br />10. Should structures be included too (in case they need to be cleaned) or will there be a new bid <br />for that? <br />The cost of drainage structure desilting should be included in the pipe desilting unit <br />price. <br /> <br />11. Is there any exfiltration of the pipe or is it all solid for drainage? <br />No exfiltration pipes are used in this project. The project requires all solid pipes for <br />drainage. <br /> <br />12. There are existing drainage pipes shown on the plans that are not labeled to be removed. Is <br />there any intent for these lines, perhaps abandonment? <br />Existing drainage pipes not labeled to be removed are to remain. See Sheet # 5 Note #5 <br />of the construction plans. <br /> <br />13 . Would you consider muck removal as part of that? <br />No excavation is considered for remaining pipes. For new sewer construction: use <br />special type of pipe bedding as indicated on sheet #37, <br /> <br />14. Paving: there are two types of road, curb and gutter, and you have a specific type of material, <br />you ask for 1" milling, 2" resurfacing, and remove the existing pavement to approximately <br />1", use type S-l asphalt concrete.? <br />Use Type S-l Mix, as per Miami-Dade County standards, <br /> <br />Bid 07-10-02 Pre-Bid Conference QA (2) <br /> <br />Page 2 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.