Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />J. Should the Contractor fail to take proper action on storage and handling of <br />equipment supplied under this Contract within seven days after written <br />notice to do so has been given, the Owner retains the right to correct all <br />deficiencies noted in previously transmitted written notice and deduct the <br />cost associated with these corrections from the Contractor's Contract. <br />These costs may be comprised of expenditures for labor, equipment usage, <br />administrative, Clerical, engineering and any other costs associated with <br />making the necessary corrections. <br /> <br />1.07 SUBSTITUTIONS AND PRODUCT OPTIONS <br /> <br />A. Products List: <br />1. Within 30 days after the effective date of the Agreement, submit to <br />the Engineer a complete list of major products proposed to be used, <br />with the name of the manufacturer and the installing subcontractor. <br /> <br />B. Contractor's Options: <br />1. For Products specified only by reference standard, select any <br />product meeting that standard. <br />2. For Products specified by naming several products or <br />manufacturers, select anyone of the products or manufacturers <br />named, which complies with the specifications, subject to the base <br />bid procedures outlined under Document 00400 - Supplemental Bid <br />Form. <br />3. For products specified by naming one or more Products or <br />manufacturers and "or equal", Contractor must submit a request as <br />for substitutions for any Product or manufacturer not specifically <br />named. <br /> <br />C. Substitutions: <br />1. For a period of 30 days after the effective date of the Agreement, the <br />Engineer will consider written requests from Contractor for <br />substitution of Products. <br />2. Submit a separate request for each Product, supported with <br />complete data, with drawings and samples as appropriate, including: <br />a. Comparison of the qualities of the proposed substitution with <br />that specified <br />b. Changes required in other elements of the work because of <br />the substitution <br />c. Effect on the construction schedule <br />d. Cost data comparing the proposed substitution with the <br />Product specified <br />e. Any required license fees or royalties <br />f. Availability of maintenance service, and source of <br />replacement materials <br /> <br />04/08 <br /> <br />01600-5 <br /> <br />06-5723 <br />