My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-01) Town Center Park Lighting Improvements
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:52 PM
Creation date
8/15/2008 3:50:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Lighting Improvements
Bid No. (xx-xx-xx)
08-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />2. All equipment having moving parts such as gears, electric motors, <br />etc. and/or instruments shall be stored in a temperature and humidity <br />controlled building approved by the Engineer, until such time as the <br />equipment is to be installed. <br />3. All equipment shall be stored fully lubricated with oil, grease, etc. <br />unless otherwise instructed by the manufacturer. <br />4. Manufacturer's storage instructions shall be carefully studied by the <br />Contractor and reviewed with the Engineer by him. These <br />instructions shall be carefully followed and a written record of this <br />kept by the Contractor. <br />5. Moving parts shall be rotated a minimum of once weekly to insure <br />proper lubrication and to avoid metal-to-metal "welding". Upon <br />installation of the equipment, the Contractor shall start the <br />equipment, at least half load, once weekly for an adequate period of <br />time to insure that the equipment does not deteriorate from lack of <br />use. <br />6. Lubricants shall be changed upon completion of installation and as <br />frequently as required thereafter during the period between <br />installation and acceptance. Mechanical equipment to be used in <br />the work, if stored for longer than ninety (90) days, shall have the <br />bearings cleaned, flushed and lubricated prior to testing and start up, <br />at no extra cost to the Owner. <br />7. Prior to acceptance of the equipment, the Contractor shall have the <br />manufacturer inspect the equipment and certify that its condition has <br />not been detrimentally affected by the long storage period. Such <br />certifications by the manufacturer shall be deemed to mean that the <br />equipment is judged by the manufacturer to be in a condition equal <br />to that of equipment that has been shipped, installed, tested and <br />accepted in a minimum time period. As such, the manufacturer will <br />guarantee the equipment equally in both instances. If such a <br />certification is not given, the equipment shall be judged to be <br />defective. It shall be removed and replaced at the Contractor's <br />expense. <br /> <br />1.10 WARRANTY <br /> <br />A. For all major pieces of equipment, submit a warranty from the equipment <br />manufacturer as specified in Section 01740. <br /> <br />1.11 SPARE PARTS <br /> <br />A. Spare parts for certain equipment provided under Division 11 through 16 <br />have been specified in the pertinent sections of the Specifications. The <br />Contractor shall collect and store all spare parts so required in an area to be <br />designated by the Engineer. In addition, the Contractor shall furnish to the <br />Engineer an inventory listing all spare parts, the equipment they are <br /> <br />04/08 <br /> <br />01600-7 <br /> <br />06-5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.