Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />associated with, the name and address of the supplier, and the delivered <br />cost of each item. Copies of actual invoices for each item shall be <br />furnished with the inventory to substantiate the delivered cost. <br /> <br />1.12 GREASE, OIL AND FUEL <br /> <br />A. All grease, oil and fuel required for testing of equipment shall be furnished <br />with the respective equipment. The Owner shall be furnished with a year's <br />supply of required lubricants including grease and oil of the type <br />recommended b the manufacturer with each item of the equipment supplied <br />under Division 11 through 16. <br /> <br />B. The Contractor shall be responsible for changing the oil in all drives and <br />intermediate drives of each mechanical equipment after initial break-in of <br />the equipment, which in no event shall be any longer than three weeks of <br />operation. <br /> <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br /> <br />END OF SECTION <br /> <br />04/08 <br /> <br />01600-8 <br /> <br />06-5723 <br />