Laserfiche WebLink
<br />U <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1.04 RECORDING <br /> <br />A. Label each document "PROJECT RECORD" in neat large printed letters. <br /> <br />B. Record information concurrently with construction progress. <br /> <br />C. Drawings; Legibly mark record actual construction: <br />1. Depths of various elements of foundation in relation to finish first <br />floor datum. <br />2. All underground piping with elevations and dimensions. Changes <br />to piping location. Horizontal and vertical locations of underground <br />utilities and appurtenances, referenced to permanent surface <br />improvements. Actual installed pipe material, class, etc. <br />3. Location of internal utilities and appurtenances concealed in the <br />construction, referenced to visible and accessible features of the <br />structure. <br />4. Field changes of dimensions and details. <br />5. Changes made by Field Order or by Change Order. <br />6. Details not on original contract drawings. <br />7. Equipment and piping relocations. <br />8. Building and tank locations. <br /> <br />D. Specifications and Addenda; legibly mark each Section to record: <br />1. Manufacturer, trade name, catalog number and supplier of each <br />product and item of equipment actually installed. <br />2. Changes made by field order or by Change Order. <br /> <br />E. Shop Drawings (after final review and approval): <br />1. One set of record shop drawings for each process equipment, <br />piping, (including casings) electrical system and instrumentation <br />system. <br /> <br />F. Certified site survey and line elevations, and stationing at increments per <br />Section 01050, by registered surveyor. <br /> <br />1.05 SUBMITTAL <br /> <br />A. At Close-out, deliver Record Documents to the Engineer for the Owner. <br /> <br />B. Accompany submittal with transmittal letter in duplicate, containing: <br />1 . Date <br />2. Project Title and Number <br />3. Contractor's Name and Address <br />4. Title and Number of each Record Document <br />5. Signature of Contractor or his Authorized Representative <br /> <br />04/08 <br /> <br />01720-2 <br /> <br />06-5723 <br />