My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-01) Town Center Park Lighting Improvements
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:52 PM
Creation date
8/15/2008 3:50:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Lighting Improvements
Bid No. (xx-xx-xx)
08-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />m <br />I <br />I <br />I <br />I <br />I <br /> <br />SECTION 02276 <br /> <br />TEMPORARY EROSION AND SEDIMENTATION CONTROL <br /> <br />PART 1 - GENERAL <br /> <br />1.01 WORK INCLUDED <br /> <br />A. Designing, providing, maintaining and removing temporary erosion and <br />sedimentation controls as necessary. <br /> <br />B. Temporary erosion controls may include, but are not limited to, mulching, <br />netting, and watering, on site surfaces and spoil and borrow area surfaces <br />and providing interceptor ditches at ends of berms and at those locations <br />which will ensure that erosion during construction will be either eliminated <br />or maintained within acceptable limits as established by the Owner. <br /> <br />C. Temporary sedimentation controls include, but are not limited to, silt <br />dams, traps, barriers, and appurtenances at the foot of sloped surfaces <br />which will ensure that sedimentation pollution will be either eliminated or <br />maintained within acceptable limits as established by the Owner. <br /> <br />D. Contractor is responsible for providing effective temporary erosion and <br />sediment control measures during construction or until final controls <br />become effective. <br /> <br />1.02 SUBMITTALS <br /> <br />A. Submit schedule for temporary erosion and sedimentation control. <br /> <br />PART 2 - PRODUCTS <br /> <br />2.01 EROSION CONTROL <br /> <br />A. Mulch:FDOT type per Section 981-3.2, Green Mulch <br /> <br />B. <br /> <br />Netting: <br /> <br />fabricated of material acceptable to the Owner. <br /> <br />2.02 SEDIMENTATION CONTROL <br /> <br />A. Bales: clean, seed free cereal hay type <br /> <br />B. <br /> <br />Netting: <br /> <br />fabricated of material acceptable to the Owner <br /> <br />C. Filter stone: crushed stone conforming to Florida Department of <br />Transportation specifications. <br /> <br />04/08 <br /> <br />02276-1 <br /> <br />06-5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.