My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-01) Town Center Park Lighting Improvements
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:52 PM
Creation date
8/15/2008 3:50:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Lighting Improvements
Bid No. (xx-xx-xx)
08-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />U <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />PART 3 - EXECUTION <br /> <br />3.01 EROSION CONTROL <br /> <br />A. Minimum procedures for mulching and netting are: <br /> <br />1. Apply mulch loosely and to a thickness of between 3/4 inch and 1 <br />1/2 inches. <br />2. Apply netting over mulched areas on sloped surfaces. <br /> <br />3.02 SEDIMENTATION CONTROL <br /> <br />A. Install and maintain silt dams, traps and barriers as shown on the <br />approved schedule. Hay bales which deteriorate and filter stone which is <br />dislodged shall be replaced as required. <br /> <br />3.03 PERFORMANCE <br /> <br />A. Should any of the temporary erosion and sediment control measures <br />employed by the Contractor fail to produce results which comply with the <br />requirements of the Owner, Contractor shall immediately take whatever <br />steps are necessary to correct the deficiency at his own expense. <br /> <br />END OF SECTION <br /> <br />04/08 <br /> <br />02276-2 <br /> <br />06-5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.