My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-01) Town Center Park Lighting Improvements
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:52 PM
Creation date
8/15/2008 3:50:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Lighting Improvements
Bid No. (xx-xx-xx)
08-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />o <br />g <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1. Remove rocks and other objects over 1 inch diameter. <br />2. Smooth soil mixtures to four (4) inches below top of surrounding <br />paving, wherever planting beds abut paved surfaces. <br />3. Do not compact planting soil mixture, but do wet-soak planting <br />areas to assure proper settlement. Replace topsoil/planting soil <br />mixture to specified grade after watering, where necessary. <br />4. Smooth topsoil to two inches (2") below finish grade in areas to be <br />sodded. Remove plant material not indicated as existing or be <br />relocated in order to adhere to sod lines. <br />5. Prior to installing planting soil, test tree pits and planting areas for <br />percolation. If areas do not drain, it is the contractor's responsibility <br />to assure percolation by approved means. <br />6. Remove limerock or soil cement in tree planter islands within paved <br />parking areas. Do not damage sub-base material for paved <br />surfaces. Assure percolation and then backfill with approved <br />planting soil mix. <br /> <br />3.04 CLEAN-UP <br /> <br />A. Immediately clean up spills, soil and conditioners on paved and finished <br />surface areas. <br /> <br />B. Remove debris and excess materials from project site immediately. <br /> <br />END OF SECTION <br /> <br />04/08 <br /> <br />02484-6 <br /> <br />06-5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.