Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />o <br />g <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1. Remove rocks and other objects over 1 inch diameter. <br />2. Smooth soil mixtures to four (4) inches below top of surrounding <br />paving, wherever planting beds abut paved surfaces. <br />3. Do not compact planting soil mixture, but do wet-soak planting <br />areas to assure proper settlement. Replace topsoil/planting soil <br />mixture to specified grade after watering, where necessary. <br />4. Smooth topsoil to two inches (2") below finish grade in areas to be <br />sodded. Remove plant material not indicated as existing or be <br />relocated in order to adhere to sod lines. <br />5. Prior to installing planting soil, test tree pits and planting areas for <br />percolation. If areas do not drain, it is the contractor's responsibility <br />to assure percolation by approved means. <br />6. Remove limerock or soil cement in tree planter islands within paved <br />parking areas. Do not damage sub-base material for paved <br />surfaces. Assure percolation and then backfill with approved <br />planting soil mix. <br /> <br />3.04 CLEAN-UP <br /> <br />A. Immediately clean up spills, soil and conditioners on paved and finished <br />surface areas. <br /> <br />B. Remove debris and excess materials from project site immediately. <br /> <br />END OF SECTION <br /> <br />04/08 <br /> <br />02484-6 <br /> <br />06-5723 <br />