My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-01) Town Center Park Lighting Improvements
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:52 PM
Creation date
8/15/2008 3:50:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Lighting Improvements
Bid No. (xx-xx-xx)
08-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> J. ASTM C-494 Concrete Ad Mixtures <br /> K. ACI 304 Truck Mixers <br /> L. ,L\STM C-31 Field Testing <br /> M. ASTM C-39 Concrete Testing <br /> N. ASTM C-42 Concrete Testing <br />1.04 DESCRIPTION <br /> <br />A. Concrete shall be of portland cement, ASTM C-94, fine aggregate, coarse <br />aggregate, water and admixtures as specified and shall be ready-mixed, <br />or transit-mixed concrete. All constituents, including admixture, shall be <br />batched at the central batch plant. <br /> <br />B. Reinforced concrete shall conform to ACI Specification 318-89 or latest <br />revision. <br /> <br />C. Field testing and inspection services required will be provided by the <br />Owner. Cost of such work, except as specifically stated otherwise, will be <br />paid for by the Owner. Methods of test will comply in detail with the latest <br />applicable ASTM Methods of Testing. <br /> <br />D. Samples of constituents and of concrete as placed will be subjected to <br />laboratory tests. Materials incorporated in the work shall conform to <br />approved samples. <br /> <br />E. Under special circumstances, the Engineer may allow minor deviations <br />from the material requirements specified, provided the resulting concrete <br />quality is not adversely affected or provided a suitable adjustment in <br />cement content is made to compensate for such deviations without cost to <br />the Owner. <br /> <br />1.05 SUBMITTALS <br /> <br />A. Submit, as provided in the General Conditions and Section 01340, shop <br />drawings showing placement of forms, form joints, major inserts and <br />blockouts. <br /> <br />1.06 QUALITY ASSURANCE <br /> <br />A. The actual acceptance of aggregates and development of mix proportions <br />to produce concrete conforming to the specific requirements shall be <br />determined by means of prior laboratory tests made by the Concrete <br />Supplier or the Contractor at his expense with the constituents to be used <br />on the work. <br /> <br />04/08 <br /> <br />03300-2 <br /> <br />06-5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.