Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />Berger Avort <br /> <br />f'.~'_(\RP )RI>'f[L <br /> <br />RFQ 07-07-03 <br />Professional Design Services for the Collins Avenue Streetscape <br /> <br />Tomei, Capital Projects Manager, Tel: 305466-8923. <br /> <br />Country Walk Drainage Basin Improvements <br />Design (Miami-Dade County DERM). <br />We provided the design for a new french drain <br />system for drainage improvements to one square <br />mile of a flood prone residential area. We proposed <br />new outfalls to Canal C-1W; performed ICPR <br />modeling for the system stages and peak discharges <br />at outfalls; Prepared ERP and Canal RIW permit <br />applications with SFWMD. <br /> <br /> <br />City Hall Landscape Design and Construction Administration, Sunny Isles Beach. Our open <br />space design concept integrates the City Hall site and adjacent restaurant into a cohesive urban <br />setting. A large fountain embraces the council chambers, <br />providing a continuous seating area for passerby and <br />employees alike, terminating at a small courtyard adjacent to <br />the library. The plaza was designed to expand north as part <br />of a future City Hall expansion project. The interplay of the <br />shimmering water and lights on the blue mosaic wall creates <br />a civic nighttime display. Services: Site Master Plan, <br />Schematic Design through Construction Phase Services for <br />Planting, Paving, Site Lighting, Irrigation, and Fountain <br />Design. Project Cost: $750,000. <br /> <br />Espanola Way Streetscape Improvements, <br />Miami Beach, Florida. The design program was to <br />develop a street plaza which reflected the <br />surrounding historic village located on Espanola <br />Way in Miami Beach. A continuous plaza, designed <br />without curbs, is designed to encourage street <br />festivals and daily social interaction. A future <br />fountain is planned for the center of the plaza. Our <br />design services included decorative paving, site <br />lighting, site furniture, and planting. Services: <br />Master Planning, Schematic Design through <br />Construction Phase Services. Project Cost: <br />$400,000 <br /> <br />-8 - <br /> <br /> <br />