Laserfiche WebLink
<br />II <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />Berger Ava rt <br /> <br />h,~nRP )F,'Ari~r <br /> <br />RFQ 07 -07 -03 <br />Professional Design Services for the Collins Avenue Streetscape <br /> <br />1b. <br /> <br />The Project Manager's Specific Technical Competency <br /> <br />Mr. Li has 15 years of experience in highway and civil design and construction administration. He <br />serves as Project Manager for BERGER AVART on various civil and roadway projects. Clients include <br />Miami-Dade County, Broward County, the Miami-Dade County School Board, the School Board of <br />Broward County, the Florida Department of Transportation and local municipalities. His project <br />experience includes water, sewer and drainage systems design; paving design; canal dredging; <br />roadway design; maintenance of traffic; environmental permitting; and project coordination and <br />inspection. The following projects summarize his professional experience: <br /> <br />~ Village of Bal Harbour, (Project Manager/City Engineer) <br />· Project Manager responsible for the design and construction services of the Collins Avenue <br />and 96th St. Streetscape and Bus Shelters Project, including new bus shelters and <br />receptacles, concrete sidewalk replacement, electrical design and utility coordination. (Cost: <br />$480,000; Design Fee: $32,000). Client Contact: Alfred Treppeda, Village Manager, Tel: 305 <br />866-4636. <br />· Water tank and distribution system study for the Village of Bal Harbour, Miami-Dade County, <br />Florida. Used Cybernet (WaterCad) by Haestad Methods to model the water system and <br />demonstrated that existing water tank could be demolished; completed the water tank <br />demolition and water system repiping design and construction administration. Client <br />Contact: Alfred Treppeda, Village Manager, Tel: 305 866-4636. <br /> <br />~ SR 84 from Glades Parkway to Weston Road, Florida Department of Transportation, <br />District IV, (Project ManagerIDesign Engineer). The scope of this project includes milling and <br />resurfacing, public involvement, RRR Report, ADA upgrade, construction of missing concrete <br />sidewalk, pavement design, photogrammetry, topographical survey, signing and pavement <br />marking and MOT. (2006 to Present), Client Contact: Bing Wang, P.E., Project Manager, Tel: <br />954 777-4406. <br /> <br />~ City of Aventura, (City Engineer) <br />· Performed plan review and inspections for the Public Works Departments. <br />· Prepared annual NPDES Report for the City to EPA, FDEP and DERM. <br />· Worked on Capital Improvement Projects, including NE 34th Avenue Lighting and Roadway <br />Improvements. <br />· Aventura Entrance Design (Aventura Blvd.) and construction administration. <br />· New Bus Shelter Design along Biscayne Blvd. (US-1). <br />Client Contact: Alan Levine, Superintendent, 305 466-8931, Antonio Tomei, Capital Projects <br />Manager, Tel: 305466-8923. <br /> <br />~ Need Assessment Program, Miami-Dade Water and Sewer Department, (Project <br />Manager). Design and construction administration services for local water and sewer <br />transporting network improvements countywide. (2001 to Present). Client Contact: Reynaldo <br />Abreu, MDWASD Project Manager, Tel: 786552-8161 <br />· MISC-71 - Water Main Extension Project at SW 36th Avenue between SW 9th Street and <br />SW 8th Street <br />· QN-61A - Water Main Extension Project at SW 18th Street and 12th Avenue <br />· UWMR-49A - Water Main Extension Project at East Dixie Highway, NE 103rd Street <br />· UWMR-90B - Water Main Extension Project at Emathla Street and Seminole Street <br />· UWMR-61A - Water Main Extension Project at SW 16th Avenue between SW 1st Street and <br />SW Flagler Terrace <br /> <br />-3- <br />