|
<br />.
<br />
<br />.
<br />
<br />.
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />13. ROLE IN THIS CONTRACT
<br />Senior Landscape Architect
<br />
<br />12 NAME
<br />Kathryn O'Leary Richards, RLA, ASLA
<br />
<br />14. YEARS EXPERIENCE
<br />I b WITH C~RRENT FIRM
<br />
<br />a. TOTAL
<br />
<br />23
<br />
<br />15. FIRM NAME AND LOCATION (C.ty and State)
<br />O'Leary Richards Design Associates, Inc. Miami, Florida
<br />
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />Bachelor of Landscape Architecture
<br />University of Florida, 1985
<br />
<br />17, CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Florida Landscape Arch itect #000013 17
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publica frons, Organizations. Traimng. Awards, elc)
<br />Membcr of the American Socicty of Landscapc Architects
<br />FNG LA A ward of Excellence for Collins A venue. 8al Harbour. Florida
<br />2005 Award for l3est So. Florida Playground from Parenting Magazine. Evelyn Greer Park. Pinecresl, Florida
<br />
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITl.E AND LOCATION (CIty and State) (2) YEAR COMPLETED
<br /> Founders Park PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Aventura. Ftorida 2001 2002
<br />a. (3) BRIEF DESCRIPTION (Bne! scope. slle, cost, etc) ANO SPECIFIC ROLE ~ Check If project performed with current firm
<br />Project Manager and lead designer for a 12.5 acre park in the heart of Aventura, Florida. This project involved several
<br /> publ ic meetings, master planning, construction documentation and construction administration. Primary
<br /> responsibilities included the design of baseball fIelds, multi-purpose soccer/football fields, four station exercise trail.
<br /> tennis courts, playground, sun shelters, an outdoor amphitheater, site furniture, extensive landscaping and irrigation.
<br /> (1) TITLE AND LOCATION (City and Slale) (2) YEAR COMPLETED
<br /> Evelyn Greer Park PROFESSIONAL SERVICES , CONSTRUCTION (II applicable)
<br /> Village of Pinecrest, Florida 1999 2000
<br />b. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE i{j Check .f projecl performed with current firm
<br />Sr. Landscape Architect and lead designer for a 10 acre active park in Pinecrest, Florida. This project involved several
<br /> public and community meetings, master planning, construction documentation and construction administration. Primary
<br /> responsibilities included the design of baseball fields, multi-purpose athletic fields, batting cages, playground parcourse
<br /> fitness jogging trail, community gazebo, site furniture, extensive landscaping and irrigation.
<br /> (1) TITLE AND LOCATION (CI/yand Sfate) (2) YEAR COMPLETED
<br /> Town Center Park PROFESSIONAL SERVICES I CONSTRUCTION (If appticable)
<br /> Sunny Isles Beach, Florida 2004 2005
<br /> (3) BRIEF DESCRIPTION (Bnel scope. size, cost, elc.) AND SPECIFIC ROLE i{j Check if project per10rmed With current firm
<br />c. Project Manager and lead designer for the development of a 3 acre park located on Collins A venue in the City of Sunny
<br /> Isles Beach. This park was carefully designed to protect its' environmental sensitivity around a tidally flushed wetland
<br /> area. Responsibilities included the development of landscape architectural plans which included amenities such as a
<br /> playground, fitcenter, open air pavilion, jogging path, life trail for seniors, landscaping and irrigation.
<br /> (1) TITLE AND LOCATION (Clly and State) (2) YEAR COMPLETED
<br /> Waterways Park PROFESSIONAL SERVICES T CONSTRUCTION (II applicable)
<br /> A ventura, Florida 2006 Under
<br /> (3) BRIEF DESCRIPTION (Briel scope, SIze, cost, elc) AND SPECIFIC ROLE IiJ Check if project per10rmed with current firm
<br />d. Project Manager for the development of a 6 acre park in A ventura, Florida. This project involvcd master planning,
<br /> construction documentation and construction administration. Responsibilities included the developmcnt of landscapc
<br /> architectural plans which included amenities such as a baseball field, multi-purpose soccer/football fields, jogging path
<br /> with exercise staions, landscaping and irrigation.
<br /> (1) TITLE AND I.OCA TlON (Crry and Slate) (2) YEAR COMPLETED
<br /> Chuck Pezoldt Park PROFESSIONAL SERVICES I CONSTRUCTION (If applrco1blc)
<br /> ivI iami. Florida 2007
<br />e. (3) BRIEF DESCRIPTION (Bnel scope, siu,. cost, elc) AND SPECIFIC ROLE 6-'J Check if project performed Wllh ccrrenl firm
<br />Project Manager and lead designer for a 40 acre park in southwest Miami-Dade County, Florida. Responsibilities
<br /> included the development of landscape architectural plans which included amenities such as baseball fields.
<br /> multi-purpose soccer/football fields, jogging path, landscaping and irrigation.
<br />
<br />STANDARD FORM 330 (612004) PAGE 2
<br />
|