Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br />Project Landscape Architect <br /> <br />12. NA.'.1E <br />Christopher J. Cawley, RLA, ASLA <br /> <br />14. YEARS EXPERIENCE <br />I b WITH C~RRENT FIRM <br /> <br />a TOTAL <br /> <br />7 <br /> <br />15. FIRM NAME AND LOCATION (Clry and Stale) <br />O'Leary Richards Design Associates, Inc. Miami, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Bachelor of Landscape Architecture <br />University of Georgia, 1999 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) <br />Florida. Landscape Architect <br /># 6666786 <br /> <br />18. OTHER PROFESSIONAL OUALlFICATIONS (Publica/Ions, Organizations. Traming. Awards, etc.) <br />Member of the American Society of Landscape Architects, Member of Village of Bal Harbour Arch. Review Board, FL <br />Inside Out Magazine - Biscayne Blvd. Competion, March 2006, The 2007 MiMo Award - The Fontana 160 I W.A ve., & <br />Merit Bldg. Award for Comm. Renovation- The Vanderbilt, 810 Penn. Ave. from Miami Design Preservation League <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (Cdy and State) (2) YEAR COMPLETED <br /> Waterways Park PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> A ventura, Florida 2006 Under Construction <br />a. (3) BRIEF DESCRIPTION (Snef scope. size. cost, etc.) AND SPECIFIC ROLE [.Lj Check if project performed w,th cerrer,l firm <br />Project Landscape Architect. This project involved all phases of Landscape Architectural design and construction <br /> documentation For a new public park located in Aventura, Florida. Primary responsibilities include the design oFthe <br /> hardscape paving areas, planting areas and coordination with the project's Civil Engineers and the City of A ventura. <br /> (1) TiTlE AND LOCATION (C.ty and State) (2) YEAR COMPLETED <br /> Fifth and Alton Retail Development and Garage Streetscape PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Miami Beach, Florida 2005 2007 <br />b. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE U Check if project performed w.th curren: firm <br />Project Landscape Architect for a large parking garage and retail development in Miami Beach. Florida. Primary responsibilities <br /> included hardscape design, planting design, and the preparation of schematic plans and construction documents. Additional <br /> responsibilities included the design ora large plaza and water reature meant to house a major piece of public artwork. <br /> (1) TITLE AND LOCATION (Cily and Slate) (2) YEAR COMPLETED <br /> Miami Beach Marina Baywalk PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> City of Miami Beach, Florida 2003-2005 2005 <br />C. (3) BRIEF DESCRIPTION (Bnel scope. SIze, cosl, elc.) AND SPECIFIC ROLE U Check .1 project pe:lormed wllh current firm <br />Project Landscape Architect and Project Manager for the complete redesign of a substantial portion of the existing <br /> Miami Beach Marina l3aywalk. Primary responsibilities included the design of the hardscape paving areas, landscape <br /> planting areas, and preparation of construction documents. Additional responsibilities included coordination with the <br /> project's Civil Engineer and the City of Miami l3each. <br /> (1) TITLE AND LOCATION (Cily and Slate) (2) YEAR COMPLETED <br /> Ocean Two Public Beach Access PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Sunny Isles Beach, Florida 2003 2004 <br /> (3) BRIEF DESCRIPTION (Bner scope. size. cost. e/c) AND SPECIFIC ROLE U Chock If project performed with current firm <br />d. Project Manager and Pr~iect Landscape Architect. This project involved the design, construction documentation, and <br /> construction supervision for the creation of a new publ ic beach access adjaccnt to Ocean [I Condominium located on <br /> Collins Avenue. Primary rcsponsibilities included design of hardscape paving areas, native planting areas, and site <br /> amenities such as benches and lighting. Additional responsibilities included construction administration and <br /> coordination with the project Architect and General Contractor. <br /> (1) TITLE AND LOCATION (Clly and State) (2) YEAR COMPLETED <br /> South Miami Municipal Parking Garage PROFESSIONAL SERVICES I CONSTRUCTION (If appllcahle) <br /> City of South Miami, Florida 2007 2007 <br />e. (3) BRIEF DESCRIPTION (Bnef scope. sIze. cost, elc) AND SPECIFIC ROLE ,~ Check if praieet perfcrmed with cerrent firm <br />Project Landscape Architect. This project involved the design and construction documentation for three streetscapes <br /> that encompass an entire City block in South Miami. Primary responsibilities included the dcsign oFthe hardscape <br /> paving areas, planting areas and coordination with the project's Civil Engineers, General Contractor and the City of <br /> South Miami. It also included presenting the project and obtaining approval From the City of South Miami's Historic <br /> Preservation Board. <br /> <br />STANDARD FORM 330 (6/2C04) PAGE 2 <br />